background image

2

INSTALLATION INSTRUCTIONS

When the pump is in operation, the drive shaft 

end and the coupling must be covered up by 

either a contact-protector or by a coupling bell. 

Pressure in discharge line and in pump must 

be at zero before any maintenance to the 

pump takes place.  Close up suction line.  Dis-

connect fuses to ensure that the driving motor 

does not get switched on accidentally.

Make sure that all parts on the pressure side 

of the unit are vented before starting the pump.  

In order to preven air, or an air-water mixture 

being absorbed and to prevent cavitation oc-

curring, the pump NPSHR suction head and 

water temperature must be kept under control.  

Cavitation and/or compression of gases 

lead to uncontrollable pressure kicks which 

can ruin pump and unit parts and also be 

dangerous to the operator or anyone stand-

ing nearby.

Giant Plunger Pumps are suitable for pump-

ing clean water and other non-agressive or 

abrasive media with a specific weight similar to 

water.

Before pumping other liquids - especially 

inflammable, explosive and toxic media - 

the pump manufacturer must under all cir-

cumstances be consulted with regard to the 

resistance of the pump material.  It is the re-

sponsibility of the equipment manufacturer 

and/or operator to ensure that all pertinent 

safety regulations are adhered to.

Required NPSH refers to water: specific weight 

1kg/dm

3

, viscosity 1°E at maximum permissible 

revolutions.

Operation and Maintenance

Check oil level prior to starting and ensure a 

trouble-free water supply.

Important!  If there is a 

danger of frost

, the 

water in the pump and in the pump fittings (par

-

ticularly the unloader valve) must be emptied.  

The second discharge port can also be used 

and the pump run “dry” for 1-2 minutes for this 

purpose.

Oil: Use only SAE 20W-50 (p/n 01153).  Use 

7.5 fluid ounces (0.22 L) for short crankcase 

covers and 9.0 fluid ounces (0.27 L) for extend

-

ed crankcase covers.

Initial change after 50 operating hours and then 

every 500 operating hours, after 1 year if used 

less.  

Caution when operating in damp places or 

with high temperature fluctuations.  Oil must 

be changed immediately, should condensate 

(frothy oil) occur in the gear box.

Keep NPSH under control.

Maximum input pressure 145 PSI (10 bar), 

maximum suction head -4.35 PSI (-0.3 bar).  

Make sure suction pulsation is sufficiently 

dampened - water column resonance must be 

avoided.

Safety Rules

Pump operation witout safety valve as well 

as any excess in temperature or speed limits, 

automatically voids the warranty.  The safety 

valve must be regulated in accordance with the 

guidelines for liquid spraying units so that the 

maximum admissible operating pressure can 

not be exceeded by more than 10%.

Содержание P200A Series Repair and

Страница 1: ...228 Series P200A 16mm versions Contents Installation Instructions page 2 Pump Specifications pages 3 Exploded View page 4 Parts List page 5 Kits Torque Specifications page 5 Recommended Spare Parts Li...

Страница 2: ...operator to ensure that all pertinent safety regulations are adhered to Required NPSH refers to water specific weight 1kg dm3 viscosity 1 E at maximum permissible revolutions Operation and Maintenanc...

Страница 3: ...Plunger Diameter Plunger Diameter Stroke Stroke Power Req d Power Req d Model GPM l min PSI bar RPM PSI bar in mm in mm BHP kW P225 0 9 3 4 2000 3000 140 200 1750 145 10 0 63 16 0 13 3 4 1 9 1 4 P226...

Страница 4: ...4 Exploded View P225 P226 P223 P228 Pumps...

Страница 5: ...9 07109 Plug 1 2 BSP 1 39A 07661 Seal 1 Spare Parts P225 P226 P223 P228 Pumps ITEM PART NO DESCRIPTION QTY 1 08300 Crankcase 1 2 06773 Oil Dipstick with O Ring 1 3 08302 Crankcase Cover Short 1 3 0830...

Страница 6: ...sleeve 23 from the valve cas ing 26 Remove the v sleeve 23A from the seal case 20 Inspect all parts including o ring 21 for wear and re place as necessary 8 Check surfaces of plunger 16 A dam aged sur...

Страница 7: ...P225 P226 P223 P228 PUMPS NOTE Contact Giant Industries for Service School Information Phone 419 531 4600 NOTE If there are deposits of any kind i e lime deposits in the valve casing be certain that t...

Страница 8: ...tomer or third party 6 Theoperationofpumpsandoraccessoriesexceedingthespecificationssetforth in the Operations Manuals provided by Giant Industries Inc Liability under this warranty is on all non wear...

Отзывы: