If necessary contact our support or contact an experienced radio or TV technician.
1.5
Changes
According to FCC-Guidelines it is not permitted to operate the device with changes that are
not approved by GfM.
1.6
Cables
To fulfill the thresholds of class B devices according to part 15 of the FCC-Guidelines it must
be ensured that all signal cables that are connected to the Peakanalyzer are shielded.
1.7
Accident Prevention
It is confirmed that the delivered product is procured according to accident prevention
regulation "Elektrische Anlagen und Betriebsmittel" (BGV-A3 der Sammlung der Einzel- und
Unfallverhütungsvorschriften der gewerblichen Berufsgenossenschaften in Deutschland)
5
.
This confirmation has only the purpose to release the company of verifying the device before
the first installation (§ 5 Abs. 1, 4 der BGV-A3). Civil warranty and liability claims are not
regulated by this confirmation.
1.8
After unpacking
After unpacking the device it should be checked for mechanical damages or loose parts in the
inner. If a transport damage is occured, contact GfM and do not install the device.
1.9
Transportation
Transport the Peakanalyzer in the original package or in a package that ensures an adequate
protection. Transport damages are excluded from guarantee claims.
1.10 Before Installation
The Peakanalyzer is assembled with different rail components, like the Industry-PC, terminals
and the power supply. These components are mostly assembled in an IP65 steel box. But they
may are also delivered as separate components for installation in a control cabinet.
If the device was carried from a cold environment to the operating area, condensation may
occur. In this situation wait until the temperature adopted to the environment and it is absolutely
dry before putting it in operation. If there is condensation due to transport or storage wait at
least 2 hours for acclimation. It must be ensured that there is no condensation water in the
IP65 steel box. Devices in the IP65 steel box must not be set into direct sunlight.
The rail components are generally intended for usage in clean and dry rooms especially for
installation in control cabinets. They must not operate under conditions with high dust or
humidity in the air, as well as conditions with explosion danger or aggressive chemical
influence.
The operational condition of the rail components is approved for ambient temperatures up to
40°C. They must be installed in a control cabinet in a way to allow free convection. If the
5 Former VBG-4, also see http://www.bgfe.de/pages/gesetze/bgv.htm