
20
Peakanalyzer Installation Manual Version 2.6
reference voltage is measured via the wires that are connected to the clamps labeled with +Ur
and -Ur. The wire pair for the high-resistance differential voltage measurement is connected
to the clamps labeled with +Ud and -Ud.
Note:
The differential voltage Ud must not exceed 25 mV! If the differential voltage is higher
than 25 mV the functionality of the resistance measuring bridge is not guaranteed.
The connection of two resistance measuring bridges is shown in Picture 10.
Picture 10: Connection of a resistance measuring bridge
– strain gauge
It is strongly recommended to set the input terminal EL3356-0010 at the end of the hardware
configuration on the right side of the Peakanalyzer or Baseanalyzer. The resistance measuring
bridge terminal must follow an end cap EL9011. The label of the terminals is in the range E1
to E9.