background image

Revolving door TSA 325 NT

100

Revolving door TSA 325 NT, 3-leaf

 

X

Place the protective leaves on blocks so that the centre of the glass pane is elevated.  

The straight glass edges must be freely accessible.

Mounting the brush strip

 

X

Spread suitable synthetic glass glue into 

the long groove for the brush strip (1).

 

X

Stick the brush strips (1) flush with the 

long edges of the glass.

Mount the locking mechanism (X) to the glass leaf

Mount the top part of the locking mechanism:

 

X

Push the locking bolts (2) into the brackets (3) for the 

manual locking device.

 

X

Screw the lift pin (5) into the locking bolts (2).

 

X

Screw the spring force pin (4) into the screw channel 

on the floor until the locking bolts (2) snap fully into 

both end positions.

 

X

Clip the protective cover (1) in place.

Содержание TSA 325 NT

Страница 1: ...Revolving door TSA 325 NT EN Installation instructions 131904 05 ...

Страница 2: ...oser automatic and manual 41 5 4 Open position monitoring 43 5 5 General installation information for NV tooth belt tension 44 5 6 Revolving door in all glass version TSA 325 NT GG 50 5 7 Speed limiter unit for TSA 325 NT 61 6 Revolving door TSA 325 NT RC 2 64 6 1 Assemblies and parts 64 6 2 Revolving door TSA 325 NT RC 2 65 6 3 Installing revolving door TSA 325 NT RC 2 68 6 4 Installation informa...

Страница 3: ...you have to do something X X If there are several actions to be taken keep to the given order Product liability In compliance with the liability of the manufacturer for his products as defined in the German Product Liability Act compliance with the information contained in this brochure product information and intended use misuse product performance product maintenance obligations to provide infor...

Страница 4: ...for gates doors and windows à à Use lifting tools adapted to the weights of the system parts à à Check the weight distribution in the ceiling construction before lifting à à Observe the Load Handling Regulation LasthandhabV The following table lists the weights of the individual components depending on their diameter passage height here 2500 mm canopy height 200 mm without air curtain Other equipm...

Страница 5: ...ective earth connection to all metal parts that can be touched 1 5 Environmentally conscious working à à When disposing of the door system separate the different materials and have them recycled à à Do not dispose of batteries and rechargeable batteries with household waste à à Comply with the statutory regulations when disposing of the door system and the batteries storage cells à à Dispose of si...

Страница 6: ...scaffolding unit Barrier tape Cable reel with GFCI 2 3 Consumables Designation Detailed description Remark Silicone silicone spray à à Permitted for glass installation laminated safety glass à à Check local specifications to determine whether silicone silicone spray is permitted Soap water Lithium soap universal lubricant on a miner al oil basis for the bearings e g Würth multi purpose grease I Su...

Страница 7: ...ystem optional 8 Automatic locking system optional 9 Covers only for manual doors 10 Foamed plastic disk 11 Upper turnstile with shaft 12 Insert sleeve centre rod 13 Side hung casement 14 Locking bolts 15 Bolt lock 16 Handle 17 Side panels 18 Blocks for side element profiles optional 19 Floor ring 20 Lower turnstile 21 Floor bearing 22 Bearing ring bearing housing below 23 Bearing plate spacer ...

Страница 8: ... à Cable plan requirements à à Observe installation height metre level mark at the construction site 4 2 Mounting the revolving door TSA 325 NT X X Secure workplace against unauthorised entry X X Always work with a second person X X Use a stepladder or step stool X X Keep inside area of track clean 4 2 1 Mounting the floor ring X X Lay 2 floor ring halves 1 and 2 together X X Determine the positio...

Страница 9: ... underfloor installation see section 5 6 Revolving door in all glass version TSA 325 NT GG on page 50 X X Aligning the centre of the floor ring The centre of the floor ring has to have the same height as the outer floor ring height of centre height of outer edge Mounting the revolving door TSA 325 NT without the floor ring is also possible optionally if the finished floor level has a sufficient lo...

Страница 10: ...tion Mount the protective plates at BO systems 4 2 4 Fill the floor ring space with screed à à Take the screed height in the floor ring into account The dimension of 22 mm in the drawing below refers to the standard entrance mats of GEZE à à GEZE recommends sealing the surface of the screed in indoor areas X X Fill the floor ring space 1 with screed Refers to the standard GEZE entrance mats Before...

Страница 11: ...unting points for the side elements à à 3 leaf doors 60 à à 4 leaf doors 45 1 System axis 2 Passage axis 3 Interior radius 4 Drilling radius for side panel attachment points 5 Exterior side panel radius Determine the centre of the door system X X Precisely determine the centre of the door system and mark Mark the interior radius X X Mark the drilling radius for the side panel mounting points 4 fro...

Страница 12: ...Interior radius 4 Drilling radius for side panel attach ment points 9 Arc size 0 5 x floor ring 4 Attach floor blocks or M6 hex screws with 10 mm head width to the floor X X Screw floor blocks 11 into the floor with countersunk screws 10 Alternatively X X Screw M6 hex screw with 10 mm head width into the floor Attach floor bearing housing X X Attach floor bearing housing to the finished floor e g ...

Страница 13: ... 2 X X Connect the 2 half shells 1 of the ceiling canopy X X Screw the 2 half shells 1 see arrows X X Check the radius of the ceiling construction Mount 2 spacers approx 4 5 mm if necessary between the halves of the ceiling on the canopy For larger systems X X Place the 2 bars 3 with cross bars into the mounted half shells ...

Страница 14: ...e drive unit The drive unit 1 can be supplied premounted or separately X X Mount the drive unit 1 parallel to the system axis 4 2 Outside 3 Inside The system axis often also corresponds to the façade axis X X Screw the drive unit 1 to the bars using 8 screws 4 ...

Страница 15: ...weight of the ceiling construction X X Use lifting tools 2 in the passage area and raise the ceiling canopy 1 at least 4 cm over the side panel height 4 2 9 Inserting the side panel When subsequently glazing the side panels the rules for using glazing blocks see Gluske Klotzfibel glass installation guide must be observed X X Insert and align the side elements 1 into the blocks in the floor ring X ...

Страница 16: ...elements and ceiling canopy X X Lower the ceiling canopy carefully onto the side element profiles X X Insert 2 glazing packers min 2 mm The ceiling canopy has to lie evenly on all the side element profiles X X If the glass has high tolerances black silicone or wet glue may be used as an alternative to the rubber seal 4 2 10 Mounting the turnstile X X Insert the turnstile 2 into the chain wheel 1 a...

Страница 17: ...ring on the chain wheel crosswise to 16 5 Nm 4 2 11 Inserting the floor bearing X X Screw the bearing ring 2 to the bearing plate 3 using the 4 screws 1 X X Grease the bearing housings of the bearing ring 2 well X X Grease the floor bearing 4 well and insert it into the bearing ring 2 ...

Страница 18: ... the collector ring to the circuit board X X Check chain length The DCU602 circuit board 4 can also be delivered separately View from below 4 2 13 Mounting the centre rod retainer X X Slide the centre rod retainer onto the top turnstile X X Thread 2 cables 4 each for the mobile safeguard ing device through the turnstile 2 and the centre rod retainer 1 The cable routing is only placed above in the ...

Страница 19: ...ach post 2 through the ceiling canopy 1 X X Thread the post safety sensor 3 cable through the ceiling canopy 4 2 15 Mounting the centre rod below X X Guide the cable 3 through the centre rod 1 and thread it into the lower turnstile 4 X X Place the centre rod 1 onto the lower turnstile 4 with bearing ring 2 4 2 16 Inserting and aligning the drive chain ...

Страница 20: ...in 1 X X Check whether the drive pinion 3 and the chain wheel 2 are flush 4 2 17 Mounting the side hung casements X X Insert the side hung casement 1 Side hung casements must be blocked on the construction site according to the blocking rules when installing glass see Gluske Klotzfibel glass installation guide ...

Страница 21: ... bottom with 2 screws each 2 onto the turnstile X X Insert the 2 cover caps 3 accessories The centre rod 1 can be turned to cover existing drill holes X X Mount the other side hung casements 3 leaf 4 leaf in the same manner Above 3000 mm system diameter turnstile braces 3 can be mounted between the side hung casements as an option ...

Страница 22: ...he chain wheels and vertically to the chain X X Tighten the 2 screws 1 again 4 3 Mounting switch contact strips on the leaves X X Pull at least one side of the switch contact strip 2 out of the profile 1 X X Screw the switch contact strips 2 to the leaf 3 using 2 M4 screws 4 each X X Attach the switch strip to the profile using the prepared drill holes The strip must be attached using M4 threads a...

Страница 23: ...fixing is carried out after commissioning 4 3 2 Wiring the revolving door WARNING Risk of fatal injury due to electric shock X X The electrical system 230 V may only be connected and disconnected by a professional electrician X X Wire the revolving door TSA 325 NT in accordance with the wiring diagram 4 4 Connect the GEZE ST220 diagnostic device Use GEZEconnects X X Connect the diagnostic device G...

Страница 24: ...ium sheet on the ceiling ring X X Screw the cover on tight 1 X X Bond the sheeting 4 X X Mount the weather guard with water gutter 5 X X Place weight over the entire surface of the sheet ing until the glue is dry 1 Ceiling canopy 2 Insulation 3 Cover 4 Sheeting 5 Water gutter X X Seal the water gutter on the construction site see arrow ...

Страница 25: ... X X Drill the holes for the locking bolts of the manual and automatic locking system optional X X Place and align segment panels 1 on the centre ceiling panel 2 and align X X In the area of the retainer profile 4 of the ceiling panels drill the segment panels 1 and cut an M4 thread into the retainer profile X X Screw in the segment panels with M4 10 countersunk head screws 3 2 screws per panel ...

Страница 26: ...lving door TSA 325 NT 26 Installation 4 5 3 Installing the entrance mat X X Install the entrance mat 1 according to the installation plan see below Installation plan X division Installation plan Y division ...

Страница 27: ... side left and right 3 Cylinder head screw M4 20 4 U profile left and right 5 Flat material left and right 6 Butt connector strip left and right X X Place the flat material 5 on the butt connector strip 6 of the side panel with a thin silicone joint 7 X X Place the U profile 4 on the flat material 5 with a thin silicone joint 8 X X Screw the flat material 5 to the butt connector strip 6 using M4x2...

Страница 28: ... 1 2 Mounting the locking ramps at the TSA 325 NT X X Mount the locking ramp 1 on the moving leaf at the pre drilled position approx 95 mm from the outer leaf edge 2 The leaf will then be inside when in night position 5 1 3 Mounting the locking ramps at the TSA 325 NT BO X X Mount the locking ramps at the two moving leaves that are positioned inside in the night position at the pre drilled positio...

Страница 29: ...NT 29 Options 5 1 4 Installation positions Installation position TSA 325 NT 3 leaf Outside Inside 1 Side hung casement 2 Locking Installation position TSA 325 NT 3 leaf Variant BO Outside Inside 1 Side hung casement 2 Locking ...

Страница 30: ...ving door TSA 325 NT 30 Options Installation position TSA 325 NT 4 leaf Outside Inside 1 Side hung casement 2 Locking Installation position TSA 325 NT BO 4 leaf Outside Inside 1 Side hung casement 2 Locking ...

Страница 31: ...g panel without touching it 1 Ceiling panel 2 Locking ramp 3 Locking WARNING Risk of fatal injury due to electric shock X X Before working on the electrical system disconnect the system from the 230 V mains network X X Dismantle the ceiling panels 1 in the area of the locking systems X X Adjust both locking systems by means of the oblong holes of the retaining plates ...

Страница 32: ... the respective end points locked unlocked of the locking bolt If the switching points are set incorrectly the switching contacts are not operated at the end points of the lock ing system so that malfunctions can occur X X Loosen the setscrews 3 of the two operating cams 4 and 5 on the extended motor axis of the locking unit Adjusting the locked position X X Use the hexagon of the manual unlocking...

Страница 33: ...ng doors with breakout function 5 2 1 Installing the central spin axis X X Remove the protective panel 1 X X Pre mount the floor bearing 2 X X Place the lower disk 2 on the floor bearing X X Unscrew the 4 screws 4 from the upper break out mechanism 3 ...

Страница 34: ...Lift the bearing plate of the upper break out mechanism 3 X X Insert the steel tube 5 of the swivelling axis onto the lower disk 2 and into the upper break out mechanism Ensure that the disk and the upper break out mechanism are exactly flush ...

Страница 35: ...itting screws X X Screw in M4 screws and press out the fitting screws with a pull off tool Fitting screws can be removed by using a screw with a larger thread and a pull off tool X X Fasten the suspension plate of the upper swivelling axis so that the central swivelling axis is position exactly vertically 5 2 2 Install BO leaf The BO leaves are pre mounted and cabled completely in the factory incl...

Страница 36: ...ted points side wards to the middle of the side elements 11 i e in the direction of the swivel axis 10 shown below The ceiling mounting ring 14 has to be adjusted upwards so that the upper BO flange can be screwed on X X Loosen the lock nuts 12 of the 3 screws 13 X X Turn in the 3 screws The ceiling mounting ring 14 is pressed upwards ...

Страница 37: ...Revolving door TSA 325 NT 37 Options X X Insert the lower BO axis into the disk 2 X X Swivel in the upper BO flange 8 and screw tight with four screws 15 ...

Страница 38: ...lockwise The opening assistance is pre tensioned The corresponding leaf 17 is always located to the right of the adjustment screw 16 X X Loosen the fastening bolts 19 of the bosh angle 18 X X Adjust the bosh angle using the threaded rod 20 When the leaf latches in the locking pin has to latch into the contour of the bosh angle without a perceptible play X X Tighten the fastening bolts 19 X X Check...

Страница 39: ...BO leaf to the termi nal 2 on the turnstile cover 5 2 5 Adjusting the break out forces of the BO leaves X X For break out doors increase the break out force on one or two leaves depending on the number of leaves so as to prevent the leaves from becoming wedged against one another Locking the central spin axis into position In order to adjust the break out forces of the leaves the system has to be ...

Страница 40: ... button X X Load the BO leaf The BO leaf may not break out Check the break out angle X X Check whether the drive is switched off after a leaf break out angle of 15 3 Central swivelling axis 4 Measuring point 5 Adjustment screw 5 2 6 Additional information for commissioning X X Adjust the maximum speed in accordance with the wiring diagram X X Adjust the maximum acceleration so that the break out d...

Страница 41: ... basis of the brush height X X Check whether the door leaf moves smoothly X X Adjust the space between the night time closer and the side element X X Align both door leaves in the closed position at the top and bottom so that the space s at the top and bottom is the same X X Screw the leaf tight and close the doors correctly The floor guide for the night time closer depends on the size Observe the...

Страница 42: ...gency stop switch option 1 5 3 3 Mount the emergency stop switch tappet contact X X Adjust the pusher contact of the emergency off switch so that the contact switch has a distance of 5 mm The spring mounted magnet 1 will only be included in the scope of delivery for manual night time closers The bracket holder 2 for the tappet contact must be attached to the exterior canopy panel 3 ...

Страница 43: ... tappet contact consists of a leaf part and a frame part installed in the track X X Before installing the night time closer mount the leaf part 1 on the associated RC 2 roller carriage X X After installing the leaf in the track align the door leaf and check for proper running behaviour including in conjunction with the tooth belt optional automatic night time closer X X After aligning the leaf pus...

Страница 44: ...he two interior pulley holders 2 may not be exceeded 1 1 2 min 500 m i n 2 0 0 m i n 2 0 0 1 Driver in open position 2 Interior pulley holders The driver may not travel so far in the direction of the closing position that the tooth belt lifts off of the innermost pulley holder This greatly increases the tooth belt tension in closing position X X Position the interior pulley holders and drivers on ...

Страница 45: ...not close completely à à System outputs the error Obstacle during opening or closing 2 1 1 Small spacing 2 Large spacing X X Distribute the pulley holders so that they are evenly distributed between the deflection pulley or motor pulley and the inner most pulley holder This will keep the tooth belt tension roughly equal across the entire travel path X X Define the positions of the drivers on the l...

Страница 46: ...ylinder head screw 3 Toothed belt 4 Driver 5 Distance X X Undo the cylinder head screw 2 X X Push the adjustable pulley 1 so that the distance 5 between the adjustable pulley 1 and the tooth belt 3 is as small as possible X X Re tighten the cylinder head screw 2 5 5 4 Turned and crossed tooth belts To keep the tooth belt as quiet as possible it must run across the largest possible number of pulley...

Страница 47: ...s correctly the tooth belt must be turned by 180 between the outermost pulley holder and the motor gear unit or deflector see arrow Smooth back of the tooth belt Toothed side Crossed tooth belts To move the leaf in the opposite direction the tooth belts must be crossed in the centre of the system using the tandem rollers 3 see arrow 3 1 2 2 1 1 Belt 1 2 Belt 2 3 Tandem roller ...

Страница 48: ... 2 Belt 2 3 Tandem roller Tooth belt guidance with rod locking and inside running night time closer An adjustable tandem roller is used in the area of the rod locking to guide the belt for inside running night time closers and guide the tooth belt around the rod locking The position of the tandem rollers can be adjusted using an adjustment screw Setting the tooth belt tension and rod locking X X S...

Страница 49: ...hanging the tooth belt tension à à Suspend the tension springs 6 in different drill holes 7 à à Change the distance between the tooth belt tensioner 1 and the motor gear unit 9 Tooth belt tensioner when using an inside running night time closer To conserve space when using an inside running night time closer the exterior lever must remain locked with countersunk head screw 4 The sliding blocks 3 m...

Страница 50: ...volving door TSA 325 NT GG with drive box and exter nally mounted control box 900 900 280 Building shell recess 1000 1000 300 A depth of at least 60 mm for the cavity is sufficient at manual doors since no drive box is installed X X When digging the cavity provide space for floor guide drainage and cable ducts 5 6 2 Mounting the floor ring and drive box X X Lay 2 floor ring halves 1 and 2 together...

Страница 51: ...Revolving door TSA 325 NT 51 Options X X Determine the position of the floor ring X X Specify the position of the drive box and align it correctly Drive box dimensions with angle frame ...

Страница 52: ...he brackets 3 X X Weld the bracket 3 to the base of the floor ring or of the drive box X X The drive box and the guides for the night time closer in the floor have to be connected to a functioning floor guide drainage by means of the supplied empty pipes approx 10 m X X Lay the empty pipe for the cabling of the sensor equipment and power supply of the drive X X Before filling the hole with screed ...

Страница 53: ...standard GEZE entrance mats 5 6 6 Installing the drive X X Open the stainless steel panel of the drive X X Install and connect the motor and drive X X Realize the cabling to the sensors X X Use the valid wiring diagram for the wiring and future commissioning 5 6 7 Inserting side elements X X Insert the 4 mm high glazing packers 3 X X Place the side elements 1 on the floor ring 4 X X Secure the ins...

Страница 54: ... joint to the post 2 3 mm 5 6 8 Placing in the ceiling glasses 4 3 2 5 1 1 First ceiling glass 2 Second ceiling glass 3 Top part clamping profile 4 Spacer 5 Bottom part clamping profile X X Place the first ceiling glass 1 on the vertical glass side panels X X Screw the top clamping profile 3 into the spacer piece 4 X X Place the second ceiling glass 2 with the top part of the clamping profile 3 be...

Страница 55: ...ow X X Seal the gap between the side panel and drum wall with clear silicone 7 X X Screw the ceiling bearing shells 8 into the top part of the clamping profile and align the mounting to the bottom floor mounted pivot bearing 9 X X After aligning screw all bracket holders firmly to the clamping profile Bracket retainers 4 in the top view ...

Страница 56: ...ions 5 6 9 Mounting the pivot bearing and turnstile below X X Screw the bearing ring 2 to the bearing plate 3 using the 4 screws 1 X X Grease the bearing housings of the bearing ring well X X Mount the turnstile 4 on the pivot bearing ...

Страница 57: ...through falling top turnstile X X Secure the upper turnstile against falling down before inserting the first door leaf X X Slide the door leaf 1 onto the bars of the turnstile and screw them on X X Screw the door leaf to the upper turnstile with screws 2 X X Insert the 2 cover caps 3 accessories ...

Страница 58: ... chain wheels and vertically to the chain X X Tighten the 2 screws 1 again 5 6 12 Wiring the door system X X Wire the door system in accordance with the wiring diagram Vertical section of the side element and locking point 1 Init sensor for the zero point 2 Opening for the locking system 3 Fixed panel 4 Floor ring 5 Hole for cable penetration 6 Empty pipe D 20 mm 7 Cable routing Position of the lo...

Страница 59: ...d of the sensor 4 for the anterior post safety can be hidden in the mounted profile 2 of the ceiling glasses 1 and threaded downwards through the post 5 6 14 Install the entrance mat X X Close the sheeting of the drive box after commis sioning has been completed X X Install the entrance mats 1 in accordance with the installation plan ...

Страница 60: ...on at the top X X Remove some roller carriages and sickle plates X X Insert roller carriages and adjust to the door height and alignment on the roller carriage using an adjustment screw X X Mount the sickle plates Vertical section of the ceiling glass with guide for the night time closer 1 Screw fitting 2 Guide rail 3 Night time closer glass door 4 Floor lock 5 Night time closer guide Horizontal s...

Страница 61: ...A 325 NT The speed limiter unit mat no 157585 is pre mounted as shown below The chain wheel and chain are placed loosely 1 Speed limiter with chain chain wheel and mounting plate The speed limiter unit can be installed in a 200 mm high ceiling similar to a drive unit ...

Страница 62: ...ws 1 and roughly position the speed limiter X X Loosen the clamping screws 2 X X Tension the chain slightly using the tensioning screw 3 X X Tighten the clamping screws 2 Replacing the speed limiter with a motor gear unit The speed limiter can be replaced if desired with a motor gear unit X X Unscrew the speed limiter 1 ...

Страница 63: ...r TSA 325 NT 63 Options X X Turn the base plate motor 2 and chain tensioner 3 X X Screw the motor gear unit 4 with speed limiter to the base plate 2 X X Place the chain 5 and set the speed limiter see previous page ...

Страница 64: ...e complete elements and require careful installation The connecting walls façades must have a structure that conforms to at least DIN EN 1627 1 Ceiling 2 Ceiling base construction 3 Motor drive unit 4 LV drive unit 5 Sickle plate 6 Ceiling panel 7 Portal 8 Interior side panel 9 Exterior side panel 10 LV leaf 11 Side hung casement 12 Floor ring ...

Страница 65: ...Connecting bracket 2 Stop buffer 3 Façade bracket 4 Frame tube inside 5 Fastening tube 6 Reinforcing brace ceiling 7 Rod locking unit 8 Cover profile 9 Pulley holder 10 Earthing connection 11 DCU 1 motor gear unit 12 Control unit 13 Rechargeable battery 14 Transformer 15 Driver 16 Roller carriage 17 Toothed belt 18 Deflection pulley ...

Страница 66: ... 325 NT RC 2 6 2 2 Safety sensor activation device LV drive A Sensor package for interior LV systems 1 Rain cover to protect the light curtain outdoors optional 2 GC 339 Light curtain to protect the main closing edge for automatic night time closers ...

Страница 67: ...olving door TSA 325 NT 67 Revolving door TSA 325 NT RC 2 6 2 3 Portals 2 types of portals can be installed on the revolving door TSA 325 NT RC2 à à Box portal à à Sandwich portal Box portal Sandwich portal ...

Страница 68: ...e section 4 2 3 Fastening the floor ring to the subsurface on page 10 6 3 4 Filling the floor ring space with screed X X Before pouring the screed ensure that the bases are installed and the floor ring is aligned Mounting the bases A flange may be used as an option for the version with floor ring and bases X X Install the sealing sheet 4 X X Insert the bases 2 into the square profile 1 from below ...

Страница 69: ... canopy see section 4 2 5 Installation without floor ring on page 11 6 3 7 Mounting the drive unit see section 4 2 7 Mounting the drive unit on page 14 6 3 8 Placing blocks for side element profiles see section 4 2 8 Lifting the ceiling canopy on page 15 6 3 9 Loosening the floor strips from the RC 2 outside side panel ...

Страница 70: ...ead screw 2 Upper floor strip 3 M5 20 countersunk head screw 4 Bottom floor strip 5 Outside floor ring 6 Inside floor ring X X Set the lower floor strip 4 on the outside floor ring 5 so that the outer edge of the floor strip is flush with the outer floor ring X X Attach adhesive seals under the external side panels and also under the profiles to seal against non pressur ised water ...

Страница 71: ...om the inside RC 2 side panel Optionally cylinder head screws with a head diameter of 10 mm M6 DIN 912 can be used instead of the blocks 6 3 12 Attaching the floor strips from the RC 2 inside side panels to the floor ring The size depends on the portal width The size will be 95 mm for a portal width of 50 mm ...

Страница 72: ...ox 200 kg Risk of injury due to falling ceiling canopy X X Only lift the ceiling canopy by means of suitable aids e g pneumatic press X X Do not stand under the raised ceiling ring X X Check the weight and weight distribution in the ceiling construction before lifting X X Use lifting tools adapted to the weight of the ceiling construction ...

Страница 73: ...Revolving door TSA 325 NT 73 Revolving door TSA 325 NT RC 2 X X Lift the canopy approx 40 mm higher than the passage height ...

Страница 74: ...Revolving door TSA 325 NT 74 Revolving door TSA 325 NT RC 2 6 3 14 Inserting the portal side panels in the floor ring with bolts mounted at the factory X X Hold the portal side elements 1 in place ...

Страница 75: ...Revolving door TSA 325 NT 75 Revolving door TSA 325 NT RC 2 6 3 15 Inserting the portal side elements into the mullion and transom façade 6 3 16 Inserting the portal side elements into the floor ring ...

Страница 76: ...Revolving door TSA 325 NT 76 Revolving door TSA 325 NT RC 2 6 3 17 Insert the side panel Further information see section 4 2 9 Inserting the side panel on page 15 ...

Страница 77: ...SA 325 NT RC 2 X X Secure the inserted side elements against falling over in the upper third X X Spray soap water or silicone spray onto the upper rubber of the side elements and ceiling canopy X X Place the ceiling construction on the side panels ...

Страница 78: ...construction into the mullion and transom façade X X The ceiling canopy has to lie evenly on all the side element profiles X X Lower the ceiling canopy carefully onto the side element profiles 6 3 19 Screwing the ceiling construction with portal side elements and side panels to the ceiling ...

Страница 79: ...6 3 20 Inserting the portal head element into the mullion and transom façade Loosen the façade mullion profile X X Remove the cover 4 cover profile 3 square profile 2 and 2 rubber profile 1 X X Insert the portal head element 5 into the mullion and transom façade ...

Страница 80: ...de X X Screw the portal head element 5 on the right and left into the portal side elements with 2 screws 6 on each side X X Drill through the portal head element 5 and the façade transom profile 7 X X Screw in with screws X X Re attach 2 rubber profiles 1 the square profile 2 the ceiling profile 3 and the cover 4 once again ...

Страница 81: ...d transom façade X X Remove the cover 1 cover profile 2 square profile 3 and retaining rubber profile 4 X X Drill through the portal side element 5 and the façade transom profile 6 X X Screw in with screws X X Re attach the retaining rubber profile 4 the square profile 3 the ceiling profile 2 and the cover 1 once again ...

Страница 82: ...leaf X X Set the markings arrows at the positions of the fixing screws 1 X X Insert the door leaf into the floor guide X X Unscrew the suspension bolt 5 from the roller carriage 3 X X Slide the move lock 4 onto the hanger bracket 2 X X Slide the roller carriage 3 over the suspension bolts ...

Страница 83: ...oller carriage screw 4 into the roller carriage to determine the height position of the door leaf 6 3 23 Mounting the sickle plates X X Slide the door leaf 2 over the vertical profile of the secondary closing edge 1 1 Secondary closing edge 2 Door leaf 3 Fixed panel X X Lay the left hand sickle plate 4 in the middle of the floor ring and slide it under the left hand door leaf ...

Страница 84: ...or ring and slide it under the right hand door leaf X X Place the middle sickle plate 6 on the floor ring X X Screw on all three sickle plates with screws 7 X X Position the main closing edge door leaf 2 flush with the secondary closing edge 1 1 Secondary closing edge 2 Main closing edge door leaf 3 Door leaf 4 Fixed panel ...

Страница 85: ...ndards and guidelines on crushing shearing and drawing in spots X X Align door leaves flush with each other Ensure the same height and parallel closing edges when doing so X X Fine adjust the height and parallel position of the door leaves at the hexagon of the suspension bolts 2 X X Tighten the lock nut 1 X X When the position of the door leaves is cor rect tighten the hexagon socket head screws ...

Страница 86: ...allation instructions for Slimdrive SL WK2 mat no 136308 6 4 Installation information for NV tooth belt tension RC2 Tooth belt installation with RC 2 rod locking The tandem roller if required is attached to the rear frame profile for RC 2 rod locking In this case the toothed side of the tooth belt must run over the tandem roller If the tooth belt rubs against the burglar protection bracket after i...

Страница 87: ...9 6 5 5 Drilling a cable guide for post safety see section 4 2 14 Drilling a cable guide for post safety on page 19 6 5 6 Mounting the side hung casements see section 4 2 17 Mounting the side hung casements on page 20 6 5 7 Fastening the side hung casements see section 4 2 18 Fastening the side hung casements on page 21 6 5 8 Adjusting the chain tensioner see section 4 2 19 Adjusting the chain ten...

Страница 88: ... door TSA 325 NT 88 Revolving door TSA 325 NT RC 2 6 7 2 Mount the outside Preparations X X Remove the transom cover 1 from the mullion and transom façade X X Stick the GYSO sealing tape 2 to the gutter profile ...

Страница 89: ...Revolving door TSA 325 NT 89 Revolving door TSA 325 NT RC 2 Mount the clamping plate 1 ...

Страница 90: ...Revolving door TSA 325 NT 90 Revolving door TSA 325 NT RC 2 Set the ceiling panel in place and screw in Variant Waterproof roof 2 Burglar protection screw 3 High resistance sealing thread lock ...

Страница 91: ... Revolving door TSA 325 NT RC 2 Mounting to the box portal and façade example Mounting to the sandwich portal and mullion and transom façade 1 Portal profile 2 Ceiling panel 3 Burglar protection screws 4 Mullion and transom façade ...

Страница 92: ...Revolving door TSA 325 NT 92 Revolving door TSA 325 NT RC 2 6 7 3 Mount inside Mount the clamping plate Push in the ceiling panel ...

Страница 93: ...ng door TSA 325 NT RC 2 Screw the façade kick plate to the interior ceiling panel 6 7 4 Insert and screw in the segment panels and sickle plates Mount the segment panels X X Insert 8 segment panels 2 and screw each one in with 2 screws 1 ...

Страница 94: ...ates 4 with screws 3 and align them to one another X X Mount the sickle plate 5 in the inside entry area 6 7 5 Install the entrance mat see section 4 5 3 Installing the entrance mat on page 26 6 8 Check list for commissioning and service X X Complete the check points according to the check list in Commissioning and service ...

Страница 95: ...uire careful installation The connecting walls façades must have a structure that conforms to at least DIN EN 1627 7 1 Assemblies and parts 1 Ceiling 2 Ceiling base construction 3 Motor drive unit 4 LV drive unit 5 Sickle plate 6 Ceiling panel 7 Portal 8 Interior side panel 9 Protective leafs 10 Exterior side panel 11 Side hung casement 12 Floor ring ...

Страница 96: ... 2 Stop buffer 3 Façade bracket 4 Frame tube inside 5 Fastening tube 6 Reinforcing brace ceiling 7 Rod locking unit 8 Cover profile 9 Pulley holder 10 Earthing connection 11 DCU 1 motor gear unit 12 Control unit 13 Rechargeable battery 14 Transformer 15 Driver 16 Roller carriage 17 Toothed belt 18 Deflection pulley ...

Страница 97: ...ing the floor ring to the subsurface see section 4 2 3 Fastening the floor ring to the subsurface on page 10 7 3 4 Filling the floor ring space with screed see section 6 3 4 Filling the floor ring space with screed on page 68 7 3 5 Removing the sickle plates see section 6 3 5 Removing the sickle plates on page 69 7 3 6 Mounting the ceiling canopy see section 4 2 5 Installation without floor ring o...

Страница 98: ...3 17 Inserting the side panel For further information see see section 4 2 9 Inserting the side panel on page 15 and section 6 3 17 on page 76 7 3 18 Inserting the ceiling construction into the mullion and transom façade see section 6 3 18 Inserting the ceiling construction into the mullion and transom façade on page 78 7 3 19 Screwing the ceiling construction to the portal side elements see sectio...

Страница 99: ...leaf 7 3 26 Installing opening position monitoring See section 5 4 7 3 27 Mounting the protective leaf Preparing the protective leaf 1 Position for locking X 2 Position for lower floor mounted pivot bearing Y 3 Position for upper floor mounted pivot bearing Z ...

Страница 100: ...roove for the brush strip 1 X X Stick the brush strips 1 flush with the long edges of the glass Mount the locking mechanism X to the glass leaf Mount the top part of the locking mechanism X X Push the locking bolts 2 into the brackets 3 for the manual locking device X X Screw the lift pin 5 into the locking bolts 2 X X Screw the spring force pin 4 into the screw channel on the floor until the lock...

Страница 101: ...al and glass do not come into con tact with one another while screwing in The protective leaf fittings can also be glued to the leaf ex works as an option 6 Bushing 7 Intermediate plate for partition from the glass 8 Metal plate 9 Screw Mounting the upper pivot bearing Z Mounting the upper part of the pivot bearing X X Screw the threaded rod 4 into the hinge 1 for protective leaves X X Push the sl...

Страница 102: ...7 and intermedi ate plate 5 Screw tightening torque max 4 Nm X X Ensure that the metal and glass do not come into con tact with one another while screwing in The protective leaf fittings can also be glued to the leaf ex works as an option 5 Intermediate plate for partition from the glass 6 Bushing 7 Metal plate 8 Screw Mounting the lower pivot bearing Y Mounting the upper part of the lower pivot b...

Страница 103: ... the metal and glass do not come into contact with one another while screwing in The protective leaf fittings can also be glued to the leaf ex works as an option 3 Intermediate plate for partition from the glass 4 Bushing 5 Metal plate 6 Screw Mounting the floor bearing X X Screw the floor bearing 3 onto the sickle plate 4 with 2 screws 2 X X Insert the sphere 1 and grease heavily The sphere 1 mus...

Страница 104: ... 2 screws 1 X X Screw in the 2 threaded pins 4 The bearing plate 3 must be installed on oppo site sides for the right and left leaves 1 Screws 2 Counterplate 3 Bearing plate 4 Threaded pins 5 Stop pins 6 Swivelling axis for glass leaf Adjusting the upper pivot bearing X X Adjust the upper pivot bearing using the threaded pins 1 such that the floor bearing 3 and interior thread 2 for the threaded r...

Страница 105: ...Revolving door TSA 325 NT 105 Revolving door TSA 325 NT 3 leaf 7 3 28 Installing the protective leaf X X Push the LV leaf towards the closed position ...

Страница 106: ... 3 leaf X X Tip the protective leaf 1 and install it in revolving door TSA 325 X X Tip the protective leaf 1 and insert it into the floor bearing 2 X X Loosen the nut 5 X X Unscrew the threaded rod 4 and screw it into the bearing plate 3 upper pivot bearing ...

Страница 107: ...t position X X Adjust the height position of the thread ed rod 1 on the upper pivot bearing and threaded rod 4 on the lower pivot bearing X X After adjustment tighten the upper nuts 2 X X After adjusting the height position clip in the caps 3 X X Check to ensure the locking bolts 5 plunge cleanly into the floor area ...

Страница 108: ... Open position monitoring on page 43 7 5 Mounting the turnstile see section 4 2 5 Installation without floor ring on page 11 7 5 1 Inserting the floor bearing see section 4 2 5 Installation without floor ring on page 11 7 5 2 Mounting the collector ring see section 4 2 12 Mounting the collector ring on page 18 7 5 3 Mounting the centre rod retainer see section 4 2 13 Mounting the centre rod retain...

Страница 109: ...ide a better overview the following illustrations are shown without side hung casement 7 7 1 Placing the cover see section 4 5 1 Placing the cover on page 24 7 7 2 Mount the outside see section 6 7 2 Mount the outside on page 88 7 7 3 Mount inside see section 6 7 3 Mount inside on page 92 7 7 4 Inserting and screwing on the segment sheeting see section 4 5 2 Inserting and screwing on the segment s...

Страница 110: ...Revolving door TSA 325 NT 110 ...

Страница 111: ...Revolving door TSA 325 NT 111 ...

Страница 112: ...ance fr geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office india geze com www geze in Italy GEZE Italia S r l E Mail italia it geze com www geze it GEZE Engineering Roma S r l E Mail italia it geze com www geze it Korea GEZE Korea Ltd E Mail info kr geze com...

Отзывы: