Slimdrive SL NT/SL NT-FR
19
Installation
X
X
Fix the cable holder (2) to the running rail.
X
X
Fix the cable holder (3) to the control unit.
X
X
Route the transformer cable (1) through the cable holder to the control unit.
6.2.10 Connecting the toothed belt locking (optional) and control unit
1
2
3
X
X
When fitting the cover (3) make sure that no cables become jammed.
X
X
Plug the cable toothed belt locking (optional) (1) in at the control unit (2).
X
X
Lay cable to the toothed belt locking (optional), shorten if necessary, strip and attach the insulated wire-end
ferrules.
X
X
Connect the cable to the toothed belt locking (optional) (see chapter 5.4) (see wiring diagram).
X
X
Place cover (3) on control unit and lock in place. The retention force of the cover can be increased by slightly
bending the cover.
6.2.11 Mounting the safety equipment
X
X
Fit safety and actuation equipment.
X
X
Route cables properly in cable ducts.
X
X
Shorten excessive cable lengths or fix them in place safely using cable ties.
For electrical installation, see wiring diagram.
6.2.12 Installing switches/buttons
For electrical installation, see wiring diagram.
6.2.13 Installing programme switch
For electrical installation, see wiring diagram.