Page 18/43
© Geobrugg AG, CH-8590 Romanshorn, Switzerland
GBE-3000A / 16
6
ROPE ANCHOR
–
INSTALLATION
The post angle is dependent on the terrain slope, see table 4.
For a slope inclination with
< 30° und
> 45° small adjustments may be made with respect to the
stakeout such as length of the retaining ropes, angle between retaining rope and post inclination of the
ground plate, etc.
Depending on the terrain conditions but in any case if terrain slope angle
> 45° it is recommended to
use “gap filling nets” (additional mesh between the terrain and bottom part of the mesh).
The anchor holes are drilled in the pulling direction, with a minimum angle of > 15° to the horizontal.
The anchors must be inserted into the holes up to the marking and mortared in a horizontal position of the anchor
head:
=75
°
>15°
>35°
D
T
ß
Ω
0°-30°
15°
32°
17°
34°
19°
36°
21°
38°
23°
40°
25°
42°
27°
44°
29°
45°
30°
:
The angle must be between 60° - 85°.
:
The angle between slope and post is 75°
as standard.
Tab. 4
d
e
Содержание GBE-3000A
Страница 2: ...Page 2 43 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 3000A 16...
Страница 3: ...Page 3 43 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 3000A 16...
Страница 41: ...Page 41 43 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 3000A 16...
Страница 42: ...Page 42 43 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 3000A 16...
Страница 43: ...Page 43 43 Geobrugg AG CH 8590 Romanshorn Switzerland GBE 3000A 16...