background image

BLIZZARD  500-900 

16 

532102        -  Rev.B

24

5.5

10

25

1

2

17

0 1

2

3

4 5

6

40

Nm

27

1.5

1

2

26

Tr

ansla

tion of the original instruc

tions

ENGLISH

6.  Move the leaf manually.  Assemble the next interlocking section at 

the end of the previous one and rest it on the pinion (

24

). Make 

sure that it is horizontal using a spirit level.

7.  Drill holes at the centre of the slots.  Fasten using suitable screws 

and washers.

8.  Repeat steps for all sections of the rack that are required for the 

length of the leaf.

9.  If a section needs to be shortened, cut it with an angle grinder 

away from the slot (

25

).

5.7  ADJUSTMENTS AND CHECKS

RISKS

PERSONAL PROTECTIVE EQUIPMENT

The operations described in this section are fundamentally important 
to the integrity and operation of the gear motor.

1.  W h e n   yo u   h ave   i n s t a l l e d   t h e   r a c k ,   l owe r   t h e   g e a r 

motor by 1.5mm (

26

-1), using the four support nuts 

(

27

-1).

2.  Check that the gear motor is level using a spirit level (

27

).

3.  Tighten the four upper locknuts to a minimum torque of 40Nm 

(

27

-2), using a hex spanner and a torque wrench.

4.  Move the gate by hand and check that:

-

There is 1.5 mm between the teeth of the rack and pinion along 
the travel

-

The rack remains engaged with the pinion along its travel 
(

26

-2)

-

The sliding gate section and gear motor do not touch at any point

-

There is no friction

Содержание BLIZZARD 500

Страница 1: ...BLIZZARD 500 BLIZZARD 900 Translation of the original instructions...

Страница 2: ...All names and trademarks mentioned are the property of their respective manufac turers Customers may make copies exclusively for their own use This manual was published in 2018 Copyright FAAC S p A de...

Страница 3: ...g 17 6 2 Installation of the Limit Switches 17 6 3 Final Operations 18 7 MAINTENANCE 18 7 1 Scheduled Maintenance 19 8 INSTRUCTIONS FOR USE 20 8 1 Safety recommendations 20 8 2 Product Warnings 20 8 3...

Страница 4: ...They are therefore required by law among other things to carry out a risk analysis of the machine automatic gate in its entirety and take protective measures to fulfil the essential safety requiremen...

Страница 5: ...ts Do not modify the original components in any way Close off the work site even temporarily and prevent access tran sit EC countries must comply with the legislation that transposes the European Cons...

Страница 6: ...ted in the leaf of the gate themotorisedmovementmustbedisabledwhenthepedestriangate is not in a safe position The installation must be visible during the day and at night If it is not appropriate solu...

Страница 7: ...kg 900 kg Sliding gate section speed 12 m min 14 m min 12 m min 14 m min Ambient operating temperature 20 C 55 C 20 C 55 C 20 C 55 C 20 C 55 C Type of use Residentialbuildings Apartment complexes Res...

Страница 8: ...are accessories 3 Electric motor 4 Magnetic limit stop sensor 5 Magnetic limit switches 6 Release device 7 Start up capacitor 8 Earth connection 9 Z16 Module 4 pinion 7 Installation Accessories 1 Base...

Страница 9: ...tec tive elements that prevent fingers from being introduced Presence of a safety area between the paving and lower edge of the leaf along its entire path providing protection from the risk of feet be...

Страница 10: ...ifiedE g 6mmhexspannersetto2 5Nm 6 2 5 Nm ELECTRICIAN S SCISSORS 6 5 5 5 3 6 HSS DRILL BIT of specified sizes M8 THREAD CUTTER of specified sizes for steel rack to be screwed on SPIRIT LEVEL 4 3 EXAMP...

Страница 11: ...8 18 90 0 50 50 7 90 0 50 95 288 132 50 6 288 132 Translation of the original instructions ENGLISH POSITIONING THE RACK 5 2 INSTALLATION DIMENSIONS POSITIONING THE BASE PLATE CENTRELINE DISTANCES Foun...

Страница 12: ...nduits out from the hole 12 1 and install the base plate Do not bury the base plate in the concrete 4 Use a spirit level to check that the slab is horizontal making any corrections before the concrete...

Страница 13: ...g automatic operation A lock with personalised key is available as an optional accessory MANUAL RELEASE 1 Open the plastic cap on the release device 15 1 2 Turn the lock clockwise using a coin or your...

Страница 14: ...level then weld the other two spacers repeating the operations in steps 5 and 6 7 If necessary install another rack section as in step 1 8 Rest the section on the pinion bringing it up to the previou...

Страница 15: ...use another rack section rest it on the pinion bring ing it up to the previous one use a third section screw clamps and a spirit level to line up the teeth and check it is level 21 8 Install the sect...

Страница 16: ...er away from the slot 25 5 7 ADJUSTMENTS AND CHECKS RISKS PERSONAL PROTECTIVE EQUIPMENT The operations described in this section are fundamentally important to the integrity and operation of the gear...

Страница 17: ...capacitor supplied between the two phases of the electric motor 6 Connect the other accessories to the electronic board not sup plied 7 Connect the mains power supply cable to the electronic board an...

Страница 18: ...he machine and the system Logbook 7 Providetheowner operatoroftheautomationwiththeECDecla ration the system Logbook with the maintenance schedule and the user instructions of the automation INSTALLING...

Страница 19: ...y 12 Check that the hand guard around the pinion is present and intact 12 Check that it is irreversible 12 Check that there is no loss of grease 12 Checktheconditionofthegearmotorcables thecableglands...

Страница 20: ...andmentalhealthandbeawareof andresponsibleforthedangerswhichuseoftheproductcanleadto Do not remain in or walk drive through the area of operation of the automation system while it is moving Do not use...

Страница 21: ......

Страница 22: ...Sede legale FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 09 57 820 www geniusg com BLIZZARD 500 900 22 532102 Rev B...

Отзывы: