November 2016
Service and Repair Manual
Scissor Components
Part No. 1272220GT
GS-2669 DC • GS-3369 DC • GS-4069 DC
25
3-3 Sciss or Ass embly, G S-4069 DC
3-3
Scissor Assembly, GS-4069 DC
How to Disassemble the Scissor
Assembly
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting
this procedure without these skills
and tools could result in death or
serious injury and significant
component damage. Dealer
service is strongly recommended.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications,
Hydraulic Hose and Fitting Torque
Specifications.
Note: This procedure will require an overhead
lifting device capable of supporting 1000 lbs / 454
kg.
1
Remove the platform. Refer to Repair
Procedure,
How to Remove the Platform
.
2
Remove the retaining fasteners that attach the
ladder to the drive chassis. Remove the ladder
and set aside.
3
Remove the cables from the linkage
assembly.
Component damage hazard.
Cables and hoses can be
damaged if they are kinked or
pinched.
4
Using an overhead lifting device attach a 4
hook sling chain to the ends of the number 4
inner arm. Make the chains tight but do not
apply lifting pressure.
Crushing hazard. The linkage
assembly could become
unbalanced and fall if not
properly supported when
removed from the machine.
5
Remove the retaining fasteners from the
number 5 pivot pins.
Note: Do not remove the external snap ring.
6
Using a soft metal drift, remove the pivot pins
and set aside.
7
Carefully lift the linkage assembly off of the
machine and place it on a structure capable of
supporting it.
8
Using a suitable supporting device, attach a
strap to the rod end of the upper lift cylinder.
Do not apply pressure.
9
Remove the upper cylinder rod end pivot pin
retaining fasteners.
10 Using a soft metal drift, remove the pivot pin.
11 Lower the lift cylinder and remove the strap.
12 Using an overhead lifting device attach a 4
hook sling chain to the ends of the number 4
inner arm. Make the chains tight but do not
apply lifting pressure.
Crushing hazard. The linkage
assembly could become
unbalanced and fall if not
properly supported when
removed from the machine.
Содержание GS-2669 DC
Страница 59: ...Service and Repair Manual November 2016 Manifolds 48 GS 2669 DC GS 3369 DC GS 4069 DC Part No 1272220GT...
Страница 134: ...November 2016 Service and Repair Manual 123 Fuse Ground and Platform Control Boxes Fuse Box Layout All Models...
Страница 137: ...Service and Repair Manual November 2016 126 Ground Control Box Layout All Models...
Страница 138: ...November 2016 Service and Repair Manual 127 Platform Control Box Layout Models with 2 Speed Lift...
Страница 141: ...Service and Repair Manual November 2016 130 Platform Control Box Layout Models with Proportional Lift...
Страница 178: ......