600-1152A 7 

 

3.0 

RECOMMENDED MAINTENANCE SCHEDULES AND PROCEDURES 

3.1 

Pedestal/Reflector Assembly Protective Finish 

The pedestal/reflector assembly should be inspected at least quarterly and should be 
maintained as follows: 

Note: 

The following describes processes and materials to repair finishes typical 

to the standard product. In the event of a customer specific finish, please 
refer to the accompanying documentation or contact General Dynamics 
SATCOM Technologies Customer Service. 

 
a.  Remove accumulations of dirt and/or grease using a solution of hot water and 

detergent.  Follow cleaning with a clear water rinse. 

b.  Repair damaged or deteriorated surface finishes as follows: 
 

3.1.1  Galvanized Steel, Reflector Back-Up Structure and Pedestal Assembly   

Reference the following General Dynamics SATCOM Technologies documents and 
procedure when touch-up of surface is necessary: 
 
400-0259 Manufacturing Process Specification (Galvanized Surfaces Only) 
450-0072 Paint Requirement (Painted Surfaces Only) 
460-0043 Manufacturing Process Specification (Painted Surfaces Only) 
 
a.  Clean thoroughly using a solvent for greasy areas; hot water and detergent for dirt 

accumulations. 

b.  Wire brush to remove oxidation. 
c.  1.  Where the galvanized finish is damaged, apply a coat of cold galvanizing type 

paint, aerosol or liquid in accordance with General Dynamics SATCOM Technologies 
procedure 400-0259. 

 

2.  Where the painted finish is damaged, apply a coat of gloss white per 460-0043. 

 

3.1.2  Reflector Surface Panels (Painted Aluminum) 

Reference the following General Dynamics SATCOM Technologies documents and 
procedure when touch-up of surface panels is necessary: 
 
450-0009 Paint Requirement (Flat White) 
450-0072 Paint Requirement (Primer) 
460-0009 Manufacturing Process Specification (For Coating Steel or Aluminum) 
460-0043 Manufacturing Process Specification (Priming) 
 
a.  Lightly sand damaged area. 
b.  Clean sanded area to remove any particles left by sanding. 
c.  Apply one coat of primer. 
d.  Allow primer to air dry. 
e.  Apply the first coat of flat white paint. 
f.  Allow first coat of flat white paint to dry thoroughly. 
g.  Apply second coat of flat white paint. 
 

Содержание SATCOM Technologies KX 120

Страница 1: ...Please include with this document the following manual s 400 0259 450 0001 450 0009 450 0072 460 0001 460 0009 460 0016 460 0043 DISCARD THIS PAGE BEFORE PRINTING...

Страница 2: ...984 1826 www gdsatcom com EXPORT CONTROL WARNING the disclosure of this document or its contents to non U S persons or the transmission of its contents outside the United States must be in compliance...

Страница 3: ......

Страница 4: ...ransmitted in this document or related documents is for the benefit of SATCOM Technologies customers and is not to be disclosed to other parties verbally or in writing without prior written approval o...

Страница 5: ...NT OR THE LOSS OF MISSION EFFECTIVENESS OR LONG TERM HEALTH HAZARDS TO PERSONNEL Important Highlights an essential installation operating or maintenance procedure practice condition or statement which...

Страница 6: ...be integrated with various types of electronic equipment This system if integrated with high power amplifiers or traveling wave tubes will be capable of transmitting microwave energy at varying power...

Страница 7: ...ilding codes and fire protection standards All persons performing work on the antenna system shall also comply with the Occupational Safety and Health Act OSHA standards and all other federal state an...

Страница 8: ...ve Assemblies 5 2 13 Azimuth Jack Assembly Repositioning Procedure 5 2 14 Material Finishes 6 3 0 RECOMMENDED MAINTENANCE SCHEDULES AND PROCEDURES 7 3 1 Pedestal Reflector Assembly Protective Finish 7...

Страница 9: ...LIST OF FIGURES Figure 1 Antenna Lubrication Points 11 Figure 2 Anti Rotation Setscrew Location 14 LIST OF TABLES Table 1 Antenna Operating Conditions 2 Table 2 Lubrication Schedule 12 Table 3 Jack Gr...

Страница 10: ...this manual such problems should be referred to the equipment manufacturer General Dynamics SATCOM Technologies 2600 N Longview St Kilgore Texas 75662 6842 Telephone 903 984 0555 Fax 903 984 7597 A li...

Страница 11: ...l Assembly A two axis elevation over azimuth kingpost pedestal is used to accurately position the RF axis of the antenna The assembly consists of all steel construction and includes the following King...

Страница 12: ...pped with the antenna 2 5 Polarization Drive Assembly For LP Feeds With External Pol Drive Only Polarization rotation is accomplished by a motorized chain drive attached to the feed support tube The f...

Страница 13: ...en the zero mark on the vernier falls between two degree marks on the protractor the vernier may be read to determine the look angle to the nearest five 5 minutes of arc For example if the zero mark o...

Страница 14: ...witch 4 Retract or extend the azimuth jack its full travel 5 Secure antenna so that the pedestal cannot rotate in azimuth This should be done in a manner that will not damage the protective paint or g...

Страница 15: ...l structure of the VertexRSI KINGPOST PEDESTAL ANTENNA includes the following a Kingpost pedestal Hot dip galvanized b Rear support legs Hot dip galvanized c Jack drive assemblies Primed and painted s...

Страница 16: ...Requirement Painted Surfaces Only 460 0043 Manufacturing Process Specification Painted Surfaces Only a Clean thoroughly using a solvent for greasy areas hot water and detergent for dirt accumulations...

Страница 17: ...ed area to remove any particles left by sanding c Apply one coat of primer d Allow primer to air dry e Apply the first coat of paint f Allow first coat of paint to dry thoroughly g Apply second coat o...

Страница 18: ...the azimuth jack as well as a removable plug used to monitor the amount of lubrication inserted into the housing are located on the face of the of the jackscrew cover tube where the cover tube fastens...

Страница 19: ...tor is attached to the pedestal at the elevation axis through two self aligning spherical bushings which are installed in the Pedestal Assembly The elevation axis grease fittings are located on the el...

Страница 20: ...Figure 1 Antenna Lubrication Points 600 1152A 11...

Страница 21: ...housing 2 each per upper and lower bearing 4 Azimuth Rod End Bearing Every 2 Months Lubrication Engineers Almagard 3751 Grease Grease fitting on end of rod end 5 Elevation Rod End Bearing Every 2 Mon...

Страница 22: ...conductors and are attached to the ground field via a lug on the lower azimuth pintle The lightning rods and ground cables must be checked periodically to insure continuity of conductance good metal...

Страница 23: ...ble remove the retaining ring and washer from one side of the pin If no setscrews are found replace the washer and retaining ring Remove the retaining ring and washer from the other side c Remove the...

Страница 24: ...a control systems to provide the antenna with varied levels of control These levels range from simple jog to a sophisticated steptrack system For job specific Control System information see the Projec...

Страница 25: ...ts option without charge either FCA SATCOM Technologies plant or service in the field IN NO EVENT SHALL SATCOM TECHNOLOGIES LIABILITY UNDER THIS WARRANTY EXCEED THE COST OF REPAIR OR REPLACEMENT OF SU...

Отзывы: