Operation
28
MGG100M Operating Manual
36833 C
WELL SITE APPROVAL
The engine was tested and is approved to operate on any wellhead gas composition with sulfur content of less than
115 mg/m
3
(5.03 gr/SCFM). Formal well site approval is unnecessary.
SETTING UP UNIT
Installing the unit comprises the following procedures.
1. Position unit for operation.
2. Connect fuel sources.
3. Ground unit.
4. Connect loads.
5. Inspect the installation.
Each procedure is explained below.
Positioning Unit
Unit should be positioned for operation as follows.
•
On level, stable ground
•
Outdoors and in a well ventilated location
•
A safe distance from doors, windows, and ventilation equipment; which can draw in exhaust
DANGER
ASPHYXIATION. RUNNING ENGINES PRODUCE CARBON MONOXIDE, A COLOR-
LESS, ODORLESS, POISONOUS GAS. CARBON MONOXIDE, IF NOT AVOIDED, WILL
RESULT IN DEATH OR SERIOUS INJURY. (000103)
•
A safe distance from flammable or combustible material, and in a position that prevents flammable material from
accumulating under or around unit
WARNING
Risk of fire. Unit must be positioned in a manner that prevents combustible material
accumulation underneath. Failure to do so could result in death or serious injury.
(000147)
•
Deploy trailer jacks
•
Chock wheels
Содержание Magnum MGG100M
Страница 4: ...This Page Intentionally Left Blank 36833 C MGG100M Operating Manual iv...
Страница 8: ...This Page Intentionally Left Blank 36833 C MGG100 Operating Manual viii...
Страница 14: ...Safety 6 MGG100M Operating Manual 36833 C This Page Intentionally Left Blank...
Страница 52: ...Operation 44 MGG100M Operating Manual 36833 C This Page Intentionally Left Blank...
Страница 76: ...Wiring Diagrams 68 MGG100M Operating Manual 36833 C This Page Intentionally Left Blank...
Страница 83: ......