22
NOTE:
It will be necessary to determine the order of “shed-
ding” the connected loads and connect the loads to
the LSM in that order. One is the highest priority and
four is the lowest priority.
Perform functional tests in the exact order pre-
sented in this manual, or damage to the switch
could be done.
IMPORTANT: Before proceeding with functional tests, read and
make sure you understand all instructions and information in this
section. Also read the information and instructions of labels and
decals affixed to the switch. Note any options or accessories that
might be installed and review their operation.
NOTE:
This test can be performed with the utility or genera-
tor connected to the loads. However if the generator
is supplying the loads and is overloaded the control-
ler may have already turned off certain loads.
Depress the “ TEST “ button on the load controller. This function
will disconnect all loads controlled by the controller. The load
controller will then reconnect each load in a timed and staggered
manner as described in the Transfer Switch Owner’s Manual.
FUNCTIONAL TESTS AND ADJUSTMENTS
Following transfer switch installation and interconnection,
inspect the entire installation carefully. A competent, qualified
electrician should inspect it. The installation should comply
strictly with all applicable codes, standards, and regulations.
When absolutely certain the installation is proper and correct,
complete a functional test of the system.
CONNECTIONS
0G9651B
GENERATOR SOURCE
CUSTOMER LOAD
T1
E1
T2
E2
0D9618-TO
(C2 & VR2)
STANDBY
UTILITY
(C1 & VR1)
48850-T
0C44
49A-
T
TO REMOVE BONDING
NEUTRAL AND ENCLOSURE
NEUTRAL BONDED
DISCONNECT BUSBAR BETWEEN
600 Volt, 5 amp.
type and rating
Replace with UL
listed fuse of same
0D3587
0G4220
0G9651A
CONNECTIONS
SOURCE
UTILITY
N1
N2
(UPPER)
(LOWER)
0 GROUND
15B +12V
23 TRANSFER
AIR 1
AIR 2
PRIORITY 1
PRIORITY 2
PRIORITY 3
PRIORITY 4
T1
NEUTRAL
CONTACTOR
1
CONTACTOR
2
CONTACTOR
3
CONTACTOR
4
W
A
R
N
IN
G
CUSTOMER CONNECTION
N
O
T
E
W
IR
E
O
R
IE
N
TA
T
IO
N
0
G
8
1
3
7
D
C
C
O
M
M
O
N
+
1
2
V
D
C
T
R
A
N
S
F
E
R
3
2
1
2
3
1
5
B
3
2
0
1
DLM
MODULE
Hot Water
Heater
APPENDIX E - SETTING THE AUTOMATIC
EXERCISE FUNCTION
2. The display will enter an Installation Assistant mode when battery
power is first connected. The assistant will prompt to first enter
the current date and time, followed by the exercise day and time.
If the battery is ever disconnected and reconnected, or fuse
removed and replaced, the Installation Assistant will be displayed
again, but only the current date and time will need to be entered.
3. If the exercise time or day ever needs to be changed, press
the escape key to access the main menu.
4. Press the left or right arrow key until ‘Edit’ is flashing and press
enter.
5. Press the right or left arrow key until the exercise time is
displayed and press enter.
6. Using the arrow and enter keys first set the exercise hour in
24 hour format, followed by the minute, and finally the day.
7. Once set, the generator will exercise each week at the same
time. Be sure to show the owners how to set the exercise
function for the day and time they want the unit to exercise.
8. If the generator is equipped with the low speed exercise feature,
it was enabled at the factory and no adjustment is needed.
Every installation has its own unique set of circumstances
and requirements. This booklet provides guidelines for basic
installations only and is not intended to cover all applications.
If there are any questions or concerns after carefully reading all
documentation received with the equipment, contact the nearest
dealer for assistance.
Appendix E
Содержание GH-410
Страница 1: ...INSTALLATION GUIDELINES Air cooled Generators www generac com or 1 888 GENERAC...
Страница 25: ...23 Electrical Schematic Drawing No 0H6386 B Electrical Data...
Страница 26: ...24 Electrical Data Wiring Diagram Schematic Drawing No 0H6385 A...
Страница 27: ...25 Wiring Diagram Schematic Drawing No 0H6385 A Electrical Data...
Страница 28: ...26 Electrical Data Wiring Diagram Schematic 8kW Drawing No 0H6912 B...
Страница 29: ...27 Wiring Diagram Schematic 8kW Drawing No 0H6912 B Electrical Data...
Страница 30: ...28 Electrical Data Wiring Diagram Schematic 8kW Drawing No 0H6912 B...
Страница 31: ...29 Wiring Diagram Schematic 10 14kW Drawing No 0H7358 C Electrical Data...
Страница 32: ...30 Electrical Data Wiring Diagram Schematic 10 14kW Drawing No 0H7358 C...
Страница 33: ...31 Wiring Diagram Schematic 10 14kW Drawing No 0H7358 C Electrical Data...
Страница 34: ...32 Electrical Data Wiring Diagram Schematic 17kW Drawing No 0H6198 D...
Страница 35: ...33 Wiring Diagram Schematic 17kW Drawing No 0H6198 D Electrical Data...
Страница 36: ...34 Electrical Data Wiring Diagram Schematic 17kW Drawing No 0H6198 D...
Страница 37: ...35 Wiring Diagram Schematic 20kW Drawing No 0H7570 B Electrical Data...
Страница 38: ...36 Electrical Data Wiring Diagram Schematic 20kW Drawing No 0H7570 B...
Страница 39: ...37 Wiring Diagram Schematic 20kW Drawing No 0H7570 B Electrical Data...
Страница 40: ...Part No 0H8538 Revision G 03 24 11 Printed in U S A...
Страница 41: ...39 GU AS DE INSTALACI N Generadores enfriados por aire www generac com o 1 888 GENERAC...
Страница 64: ...Parte No 0H8538 Revisi n G 24 03 11 Impreso en los EE UU...
Страница 65: ...63 CONSIGNES D INSTALLATION G n rateurs refroidis l air www generac com ou 1 888 GENERAC...
Страница 88: ...R f rence 0H8538 R vision G 24 03 11 Imprim aux tats Unis...
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......
Страница 98: ......
Страница 99: ......
Страница 100: ......
Страница 101: ......
Страница 102: ......
Страница 103: ......
Страница 104: ......