Generac Power Systems 4451 & 4986 Скачать руководство пользователя страница 1

www.guardiangenerators.com

PORTABLES

PO BOX 297 • WHITEWATER, WI 53190

www.guardiangenerators.com

P/N OF7713 REV. A                                                                                                  Printed in the USA                                                                                                            6.06

MODELS:

4451 & 4986 (12,500 Watt)
4582 & 4987 (15,000 Watt)
4583 (17,500 Watt)

5209 (15,000 Watt)
5308 (17,500 Watt)

ULTRA SOURCE PORTABLE GENERATOR

DIAGNOSTIC 

REPAIR MANUAL

0F7713 Cover-rev.qxd  7/5/2006  4:18 PM  Page 1

Содержание 4451 & 4986

Страница 1: ...www guardiangenerators com TABLES MODELS 4451 4986 12 500 Watt 4582 4987 15 000 Watt 4583 17 500 Watt 5209 15 000 Watt 5308 17 500 Watt TRA SOURCE PORTABLE GENERATOR DIAGNOSTIC REPAIR MANUAL...

Страница 2: ...satisfy themselves that neither his nor the products safety will be endangered by the ser vice procedure selected All information illustrations and specifications in this manual are based on the late...

Страница 3: ...TER 13 Stator Insulation Resistance Test 13 GENERAL 13 TESTING ALL STATOR WINDINGS TO GROUND 14 TEST BETWEEN WINDINGS 14 Rotor Insulation Resistance Test 15 Cleaning the Generator 15 Drying the Genera...

Страница 4: ...ELAY WIRING 56 Test 35 Check and Adjust Ignition Magnetos 56 TEST 36 TEST FUEL SHUTOFF SOLENOID 57 TEST 37 TEST FUEL SHUTOFF SOLENOID VOLTAGE 57 TEST 38 CHECK FUEL PUMP 57 Test 39 Check Carburetion 58...

Страница 5: ...er the current flow through the conductor the stronger the magnetic field around the conductor The increase in the number of lines of force is directly proportional to the increase in current flow and...

Страница 6: ...pole ROTOR must operate at 1800 rpm to deliver a 60 Hertz AC frequency or at 1500 rpm to deliver a 50 Hertz AC frequency STATOR ROTOR MAGNETIC FIELD Figure 1 4 A Simple AC Generator CURRENT VOLTAGE O...

Страница 7: ...2 If the actual sensing voltage is less than the pre set reference voltage the Regulator will increase the regulated current flow to the Rotor 3 In the manner described the Regulator maintains an act...

Страница 8: ...only at the unit s rated operating speed and AC frequency 2 The generator s Voltage Regulator can be adjusted for correct output voltage only while the unit is operating at its correct rated speed and...

Страница 9: ...nt flow in each individual line Then add the individual readings In Line Alternatively to read the current flow in AMPERES an in line ammeter may be used Most Digital Volt Ohm Meters VOM will have the...

Страница 10: ...the amount of EMF that will cause a current of 1 ampere to flow through 1 ohm of resistance aMpeRe Unit measuring rate of current flow number of electrons past a given point oHM Unit measuring resist...

Страница 11: ...r components of the AC generator Rotor Assembly The 2 pole rotor must be operated at 3600 rpm to supply a 60 Hertz AC frequency The term 2 pole means the rotor has a single north magnetic pole and a s...

Страница 12: ...he positive brush and slip ring The excitation and field boost cur rent passes through the windings and to frame ground via the negative slip ring and brush and Wire 0 This current flow creates a magn...

Страница 13: ...ree light emitting diodes LED s These LED s are normally on during operation with no faults in the system The RED regulator LED is on when the regulator is on and functioning The Yellow sensing LED is...

Страница 14: ...itation Circuit Breaker Wire 162 and Wire 6 Unregulated alternat ing current can flow from the winding to the regulator The Voltage Regulator senses AC power winding output voltage and frequency via s...

Страница 15: ...number of megohms on the meter The MINIMUM acceptable megger reading for stators may be calculated using the following formula MINIMUM INSULATION GENERATOR RATED VOLTS RESISTANCE _____________________...

Страница 16: ...and observe the breakdown lamp on tester DO NOT APPLY VOLTAGE LONGER THAN 1 SECOND After one 1 second turn the tester switch OFF If the breakdown lamp comes on during the one sec ond test the stator s...

Страница 17: ...ng nearest the rotor bearing 2 Connect the black tester probe to a clean frame ground such as a clean metal part of the rotor shaft POSITIVE TEST LEAD Figure 3 10 Testing Rotor Insulation 3 Turn the t...

Страница 18: ...OTENTIOMETERS RESPONSE RECOVERY DAMPEN SENSING LED 2 1 ON Figure 4 1 Printed Circuit Board TERMINAL WIRE FUNCTION 1 15B 12 VDC input when the Start Stop Relay SSR is energized 2 83 Ground input when t...

Страница 19: ...CONTACTOR RELAY SCR IDLE CONTROL TRANSFORMERS ICT PRINTED CIRCUIT BOARD 10 AMP FUSE F1 LOCATED IN REAR OF CONTROL PANEL DIODE D1 RESISTOR R1 CONNECTOR C2 CONNECTOR C1 50 AMP CIRCUIT BREAKER EXCITATIO...

Страница 20: ...77A 66A 55A 44S 11S 0 4 77 66 55 6 PIN LOCATION 7 PIN LOCATION 6 0 4 77 66 55 6 2 77A 66A 55A 44S 11S PIN LOCATION 6 PIN LOCATION 7 PIN LOCATION 1 PIN LOCATION 12 13 86 167 0 15 18 0 13 15 16 17 14 P...

Страница 21: ...NOTES Page 19...

Страница 22: ...ed to the Start Stop Relay SSR it goes through the coil and comes out as wire 229 12 VDC wire 229 is connected to the printed circuit board and is held open to ground No current flows through the circ...

Страница 23: ...D 44B 11B 11B 0 11A 44A 22 20A C B 20A 30A C B 30A C B 30A C B 50A C B 30A C B FIELD 0 167 SW1 0 C1 12 FSS LOP 0 15 17 0 17 15 0 0 86 14 C2 8 C2 3 C2 4 C2 10 C2 5 C2 7 C2 1 C2 2 15 C2 12 0 0 16 SC BAT...

Страница 24: ...15 15 15 15 15 14 18 18 167 167 86 86 4 4 162 11S 44S 22 11 11 0 22 44 44 77A 77 66A 66 77 0 2 2 2 6 6 6 11S 4 0 44S RED BLK BLK 83 0 0 0 0 0 229 15B 15 15 15 0 17 17 4 POWER WINDING DPE WINDING I C...

Страница 25: ...2 BATTERY CHARGE RECTIFIER BCR1 BATTERY CHARGE RECTIFIER 10A I C T IDLE CONTROL TRANSFORMER SW2 IDLE CONTROL SWITCH TB1 TB2 TERMINAL BLOCK 13 12 VDC SUPPLY 12 VDC CONTROL AC POWER GROUND With the Star...

Страница 26: ...nce the engine has started the Start Run Stop Switch SW1 is released and will be in the run position at this point SW1 is not activated This action will de energize the Starter Contactor Relay SCR cau...

Страница 27: ...PLEX 120V 120V GFCI 30A 120 240V R1 D2 D3 BA CB2 5AMP AUTO RESET BREAKER D1 600V 12A DIODE BCR2 BATTERY CHARGE RECTIFIER BCR1 BATTERY CHARGE RECTIFIER 10A I C T IDLE CONTROL TRANSFORMER SW2 IDLE CONTR...

Страница 28: ...11S 4 0 44S RED BLK BLK 83 0 0 0 0 0 229 15B 15 15 15 0 17 17 4 POWER WINDING DPE WINDING I C T I C T I C R1 D1 TB1 TB2 12Vdc BA 13 14 13 CIRcUIT CONDITION STOP With the Start Run Stop Switch SW1 pla...

Страница 29: ...5 OHM 25W RESISTOR IM2 IGNITION MODULE CYL 2 FSS FUEL SHUT OFF SOLENOID CB1 10AMP AUTO RESET BREAKER LOP LOW OIL PRESSURE IM1 IGNITION MODULE CYL 1 GND GROUND BAR F1 10A FUSE D2 D3 ENGINE SHUTDOWN DIO...

Страница 30: ...PROBLEM 2 GO TO PROBLEM 2 GO TO PROBLEM 3 GO TO VOLTAGE REGULATOR ADJUSTMENT PAGE 11 TEST 1 CHECK NO LOAD VOLTAGE FREQUENCY If Problem Involves AC Output VOLTAGE FREQUENCY BOTH HIGH OR LOW FREQUENCY...

Страница 31: ...13 TEST 7 FIELD BOOST TEST 12 CHECK BRUSH LEADS TEST 13 CHECK BRUSHES SLIP RINGS TEST 14 CHECK ROTOR ASSEMBLY REPAIR OR REPLACE BAD BAD BAD BAD GOOD GOOD GOOD GOOD GOOD GOOD GOOD GOOD GOOD GOOD BAD B...

Страница 32: ...ST 14 CHECK ROTOR ASSEMBLY REPAIR OR REPLACE REPAIR OR REPLACE BAD GOOD BAD BAD BAD REPLACE FUSES THEN RETEST Problem 2 Generator Produces Zero Voltage or Residual Voltage 2 12 VAC continued G E F TES...

Страница 33: ...R REPLACE REPLACE FINISHED GOOD GOOD GOOD BAD BAD BAD BAD Problem 4 No Battery Charge Output TEST 18 CHECK 10A BATTERY CHARGE OUTPUT TEST 19 CHECK BATTERY CHARGE RECTIFIER TEST 20 CHECK 10A CIRCUIT BR...

Страница 34: ...ECK VOLTAGE AT STARTER CONTACTOR REPLACE FUSE FUSE BLOWS REPAIR OR REPLACE WIRING OR SCR REPAIR OR REPLACE WIRE 16 REPLACE BAD BAD REPLACE GO TO PROBLEM 9 GOOD GOOD NO VOLTAGE MEASURED FUSE BAD BAD TE...

Страница 35: ...ELAY WIRING TEST 30 CHECK SPARK PLUGS TEST 35 CHECK AND ADJUST IGNITION MAGNETOS TEST 39 CHECK CARBURETION TEST 33 TEST WIRE 167 TEST 40 CHECK VALVE ADJUSTMENT CHECK FLYWHEEL KEY SEE TEST 35 TEST 41 C...

Страница 36: ...ARK PLUG PUSH IN AFTER STARTING REPLENISH FUEL SUPPLY ADJUST OR REPLACE REPAIR OR REPLACE AS NECESSARY REFER TO ENGINE SERVICE MANUAL P N 0E2081 FOR FURTHER ENGINE SERVICE INFORMATION GOOD GOOD GOOD G...

Страница 37: ...D FUSE BLOWS WHEN RUNNING FUSE IS GOOD BUT BLOWS WHEN PLACED TO START VERIFY START RUN STOP SWITCH IS WIRED CORRECTLY SEE FIGURE 6 46 pg 55 Problem 10 10 Amp Fuse F1 Blowing INSTALL NEW 10 AMP FUSE TE...

Страница 38: ...E CONTROL TRANSFORMERS ICT REPLACE BAD REPAIR OR REPLACE Problem 13 Idle Control RPM Does Not Increase When Load Is Applied REPLACE PRINTED CIRCUIT BOARD VERIFY THAT WIRE 11 WIRE 44 ARE ROUTED THROUGH...

Страница 39: ...p 240 50A Figure 6 1 VOM Test Leads Connected to 50A Outlet NOTE If the generator is not producing AC Power loss of governor control may occur caus ing an overspeed or extremely high RPM condi tion If...

Страница 40: ...overspeed or extremely high RPM condi tion If this condition occurs manually control throttle 60Hz 3600 RPM to perform test 1 Unplug the six pin connector at the Voltage Regulator 2 Disconnect Wire 14...

Страница 41: ...test lead to Wire 4 at Diode D1 See Figure 6 12 18 Start the generator 19 Measure the DC Rotor Amp draw and record the results Rotor Amp Draw ________________ 20 Shutdown the generator 21 Reconnect t...

Страница 42: ...e end of the six pin harness as follows RED EMPTY ORANGE BROWN YELLOW BLACK Figure 6 4 Six Pin Connector Wire Colors NOTE Press down with the meter leads on the connectors exposed terminals do not pro...

Страница 43: ...d from the Voltage Regulator See Figure 6 11 Be careful not to damage the pin connectors with the test leads 5 Remove Wire 162 from the Excitation Circuit Breaker CB1 Connect the other meter test lead...

Страница 44: ...tion should be measured D2 4 14 WIRE 14 REMOVED 14 4 R1 OL Figure 6 15 Diode Test Step 5 6 Connect the positive meter test lead to the bottom terminal of the diode D1 Connect the negative meter test l...

Страница 45: ...rge winding resistance should be read PIN LOCATION 6 PIN LOCATION 7 PIN LOCATION 1 PIN LOCATION 12 2 77A 66A 55A 44S 11S 0 4 77 66 55 6 Figure 6 18 C1 Connector Female Side 9 Connect the meter test le...

Страница 46: ...Pin 9 at the C1 connector female side Be care ful not to damage the pin connectors with the test leads use paper clips do not force probes into connectors See Figure 6 18 INFINITY should be read RESU...

Страница 47: ...tep 6 If no resis tance is measured continue 4 Remove the control panel assembly to access the brushes See Figure 6 21 Connect one meter test lead across Wire 4 Pin 11 at the C1 connector female side...

Страница 48: ...L OHMS 004451 0 004986 0 7 01 004582 0 1 004987 0 005209 0 7 71 004582 2 004987 1 13 1 004583 0 005308 0 14 2 Resistance values in ohms at 20 C 68 F Actual readings may vary depending on ambient tempe...

Страница 49: ...7 for BCR1 location 2 Set a voltmeter to measure DC Amperage Connect the posi tive test lead to the center terminal of the Battery Charge Rectifier Connect the negative test lead to Wire 13A previ ous...

Страница 50: ...meter test lead to one terminal of the circuit breaker Connect the other meter test lead to the remaining terminal on the circuit breaker Continuity should be measured See Figure 6 26 RESULTS 1 If con...

Страница 51: ...adly corroded Set the voltmeter to mea sure DC voltage Connect the positive meter test lead to the Starter Contactor stud that the battery cable is connected to Connect the negative meter test lead to...

Страница 52: ...to check the engine for freedom of rotation by removing the spark plugs and turn ing the crankshaft over slowly by hand to be sure it rotates freely WARNING DO NOT ROTATE ENGINE WITH ELECTRIC STARTER...

Страница 53: ...ter and on the tachometer rpm STARTER CONTACTOR STARTER MOTOR TACHOMETER 12 VOLT BATTERY CLAMP ON AMP METER VISE Figure 6 34 Testing Starter Motor Performance Note Take the reading after the ammeter a...

Страница 54: ...e terminal and the other meter test lead to the other terminal With meter leads connected acti vate the switch to Start Stop or Run and follow the chart 4 Reconnect all wires to the switch CONDITION T...

Страница 55: ...sion lead from a spark plug 2 Attach the high tension lead to the spark tester terminal 3 Ground the spark tester clamp by attaching to the cylinder head see Figure 6 37 4 Crank the engine rapidly Eng...

Страница 56: ...replace it 4 Remove Wire 0 Wire 18 Wire 15 Wire 15B Wire 15 and Wire 14 See Figure 6 42 5 Set a voltmeter to measure resistance Remove jumper lead from Step 3 Connect meter test leads across TEST POI...

Страница 57: ...d to Wire 167 at Terminal Block 1 TB1 Connect the negative meter test lead to frame ground Place the Start Run Stop Switch SW1 to start 12 VDC should be measured If 12 VDC is measured replace Wire 167...

Страница 58: ...th the test leads Continuity should be measured If continuity is not measured repair or replace Wire 229 between the J2 connector and TB1 RESULTS 1 If Step 3 passed refer to Flow Chart 2 If Step 3 fai...

Страница 59: ...lenoid should be felt It can then be assumed that the Fuel Shutoff Solenoid is functioning RESULTS Refer to flow chart TEST 37 TEST FUEL SHUTOFF SOLENOID VOLTAGE PROCEDURE 1 Set a voltmeter to measure...

Страница 60: ...the needle so it can be cleaned 4 With all of this removed carburetor cleaner can be used to clean the rest of the carburetor before reassembly 5 After cleaning carburetor with an approved carburetor...

Страница 61: ...aping at the carburetor the exhaust and the crankcase breather This will determine where the fault lies 9 Repeat Steps 1 through 8 on remaining cylinder Results Air escapes at the carburetor check int...

Страница 62: ...at 10 psi for v twin engines 3 Remove the oil pressure gauge and reinstall the oil pressure switch Do NOT connect Wire 86 or Wire 0 to the switch termi nals a Set a voltmeter to measure resistance b...

Страница 63: ...e Start Stop Relay SSR dis connect Wire 15 from the Starter Contactor SC Disconnect Wire 15 from the Start Run Stop Switch SW1 and disconnect Wire 15 from the Battery Charge Rectifier 2 BCR2 4 Remove...

Страница 64: ...d and repeat Step 2 20 kohm SSR 15B 14 13 9 10 12 5 1 2 6 4 8 229 0 18 14 15 15 15 Figure 6 56 Check Wire 15B RESULTS 1 If continuity was measured in Step 2 but not in Step 3 replace the printed circu...

Страница 65: ...er test leads across both terminals of SW2 See Figure 6 59 4 In the OFF position the meter should read INFINITY or Open In the ON position the meter should read CONTINUITY or Closed RESULTS 1 If the s...

Страница 66: ...ormers If resistance was mea sured proceed with Step 4 4 Set a voltmeter to measure AC Voltage 5 Connect one meter test lead to one wire and connect the other meter test lead to the other wire 6 Turn...

Страница 67: ...on the J2 Connector previously removed Be careful not to damage the pin connectors with the test leads Continuity should be measured RESULTS 1 Repair or replace defective wiring 2 If wiring tests good...

Страница 68: ...anel Remove the control panel Figure 7 2 Stepper Motor Harness Figure 7 3 Control Panel Removed Figure 7 4 Remove Air Deflector 4 Remove air deflector Figure B Item 45 from cross member 5 Remove the M...

Страница 69: ...NG CARRIER Figure 7 6 Support Alternator 7 Remove Rotor Remove rotor bolt Figure A Item 11 Cut 2 5 inches from the hex head end of the rotor bolt Slot the end of the bolt to suit a flat blade screwdri...

Страница 70: ...EXPLODED VIEWS Page 68 10 33 39 24 14 23 46 31 13 31 39 17 28 42 43 44 19 32 10 17 16 9 3 5 30 20 1 7 25 40 19 32 22 24 26 31 36 28 32 31 28 27 45 29 18 28 10 40 41 30 11 12 21 4 34 32 15 37 6 2 35 2...

Страница 71: ...ID 21 1 ASSEMBLY BRUSH HOLDER 22 1 SCREW TAP R 10 32 X 9 16 23 1 WASHER FLAT 3 8 ZINC ITEM QTY DESCRIPTION 24 5 WASHER LOCK 3 8 25 4 SCREW HHC 3 8 16 X 1 1 4 G5 26 4 WASHER FLAT 3 8 M10 ZINC 27 4 SCRE...

Страница 72: ...30 28 5 6 7 8 9 14 32 42 24 26 27 31 29 51 29 5 19 18 17 20 16 10 1 37 3 11 12 13 33 35 7 7 6 36 34 23 39 38 41 40 39 17 2 44 43 46 25 17 6 7 47 48 49 50 52 7 6 36 Detail of Battery Tray POWER WIRE TO...

Страница 73: ...4 2 SCREW HHC M8 1 25 X 30 25 4 SCREW HHTT M6 1 0 X 12 26 6 NUT LOCK FL 3 8 16 27 6 BOLT CARR 3 8 16 X 1 ITEM QTY DESCRIPTION 28 1 AXLE 3 4 DIA X 30 15 kW AXLE 3 4 DIA X 27 25 12 5 kW 29 2 4 WASHER FL...

Страница 74: ...9 11A 11A 44A 44B 11B 11C 11D 44D 22 22 22 0 0 0 0 0 0 0 0 0 0 0 GFCI DUPLEX 120V 20A HOT 3 1 HOT WHITE 4 5 WHITE 2 G WHITE G WHITE 120V 30A TWISTLOK 120V 30A TWISTLOK F1 0 0 0 15 15 0 0 0 0 13 15 14...

Страница 75: ...83 83 86 SWITCH TB1 TB2 RECTIFIER BATTERY CHARGE BATTERY CHARGE RECTIFIER 4 4 4 RED 1 2 3 4 6 7 8 9 10 5 11 12 PIN 22 22 GND LEGEND BA BRUSH ASSEMBLY CB1 5AMP AUTO RESET BREAKER D ENGINE SHUTDOWN DIO...

Страница 76: ...0 C1 12 C1 11 C1 7 C1 6 C1 1 C1 2 C1 4 C1 9 C1 8 C1 10 C1 5 C1 3 77 66 BCR1 13A CB2 83 167 229 15B 0 86 SW2 CB1 15A 0 F1 SC 229 14 15B 18 0 15 15 15 0 14 14 14 14 86 13 15 15 15 15 15 15 15 15 14 18 1...

Страница 77: ...0 22 44 0 17 17 4 SCR STARTER CONTACTOR RELAY SW1 START RUN STOP RELAY SSR START STOP RELAY SP2 SPARK PLUG CYL 2 SP1 SPARK PLUG CYL 1 SM STARTER MOTOR SC STARTER CONTACTOR R1 25 OHM 25W RESISTOR IM2 I...

Страница 78: ...0 229 11A 11A 44A 44B 11B 11C 11D 44D 22 22 22 0 0 0 0 0 0 0 0 0 0 0 GFCI DUPLEX 120V 20A HOT 3 1 HOT WHITE 4 5 WHITE 2 G WHITE G WHITE 120V 30A TWISTLOK 120V 30A TWISTLOK F1 0 0 0 15 15 0 0 0 0 13 15...

Страница 79: ...167 83 83 86 SWITCH TB1 TB2 RECTIFIER BATTERY CHARGE BATTERY CHARGE RECTIFIER 4 4 4 RED 1 2 3 4 6 7 8 9 10 5 11 12 PIN 22 22 GND LEGEND BA BRUSH ASSEMBLY CB1 5AMP AUTO RESET BREAKER D ENGINE SHUTDOWN...

Страница 80: ...2 4 0 C1 12 C1 11 C1 7 C1 6 C1 1 C1 2 C1 4 C1 9 C1 8 C1 10 C1 5 C1 3 77 66 BCR1 13A CB2 83 167 229 15B 0 86 SW2 14 HM CB1 15A 0 0 F1 SCR 229 14 15B 18 0 15 15 15 0 14 14 14 14 86 13 15 15 15 15 15 15...

Страница 81: ...1 0 22 44 0 17 17 4 SCR STARTER CONTACTOR RELAY SW1 START RUN STOP RELAY SSR START STOP RELAY SP2 SPARK PLUG CYL 2 SP1 SPARK PLUG CYL 1 SM STARTER MOTOR SC STARTER CONTACTOR R1 25 OHM 25W RESISTOR IM2...

Страница 82: ...ISTLOK WHITE 0 4 5 WHITE 2 WHITE 120V 20A GFCI X Y G C B 60A 50A 60A OUTLET 120 240V 50A 55A 55 14 0 0 15 15 0 229 14 167 86 0 0 15B 44 11 18 14 44A 11A 44A 11A 11 44 22 44 44 44 11 11 11 11 44 11 44...

Страница 83: ...GROUND BAR F1 10A FUSE D2 600V 12A DIODE D ENGINE SHUTDOWN DIODE BA BRUSH ASSEMBLY LEGEND RECTIFIER CHARGE BATTERY CHARGE BATTERY RECTIFIER D2 R1 22 ENGINE SHUTDOWN P C B ELECTRONIC GOVERNOR CONTROL S...

Страница 84: ...10 77A 77 77 C1 8 55 C1 5 77A C1 3 55A CONTROL PRINTED CIRCUIT 167 5 229 TR2 86 22S 8 9 10 6 7 83 TR1 0 15B 2 3 4 1 BOARD 11S 22S 11S TB2 22S 18 GOVERNOR C2 1 D3 D2 15 15B 4 6 18 15B 229 12 0 5 14 14...

Страница 85: ...RAL NEUTRAL CIRCUIT 13 CIRCUIT 11 CIRCUIT 3 CIRCUIT 1 CIRCUIT 7 CIRCUIT 5 CIRCUIT 15 CIRCUIT 15 CIRCUIT 11 GROUND BAR ORG LT BLU DRK BLU PNK YEL WHT YEL BRN WHT BRN WHT WHT WHT WHT WHT GRN ORG ORG WHT...

Страница 86: ...Section 8 ELECTRICAL DATA Page 84 INTERCONNECTION DRAWING 17 5 KW GENERATOR CONNECTED TO THE EXTERNAL CONNECTION BOX MANUAL TRANSFER SWITCH AND HOME S MAIN ELECTRICAL DISTRIBUTION PANEL...

Страница 87: ...Page 85 NOTES...

Страница 88: ...3600 RPM 27 30 33 Displacement 763cc 992cc 992cc Spark Plug Type Champion RC14YC or Equivalent Spark Plug Gap 0 040 inch or 1 01 mm Gasoline Capacity 16 U S gallons Oil Type Summer SAE 30 or 10W 30 W...

Страница 89: ...ake Manifold 14 ft lbs Exhaust Manifold 14 ft lbs Stator Bolt 12 ft lbs Rotor Bolt 30 ft lbs Spark Plug 15 ft lbs Starter Bracket To Block 18 ft lbs Torque Specifications M3 5 PHILLIPS PAN HEAD SCREW...

Страница 90: ......

Отзывы: