V
03/17
OptiFlex A2 (AS08)
Start-up
•
13
Start-up
Set-up and assembly
Assembly notes
CAUTION
Tilting danger!
►
After unpacking and installing the OptiFlex system, the control
cabinet is to be fitted to the floor with the supplied steel bolts.
►
The mounting holes are located in the control cabinet base.
The internal connections have already been made at the factory. The
control unit connections to the external plant parts must be done at the
start-up. The connection possibilities for the individual control units are
found in the corresponding operating manuals.
When connecting, pay attention particularly to the length and the
radii of the pneumatics hoses!
Configuration
A maximum of up to 21 control units can be installed. OptiFlex A2 control
cabinets can be laterally lined up without gap, and/or be set up at a wall.
Not used openings are covered with blind plates. These are screwed on
and can be easily removed, when possible extension of the OptiFlex A2
Control system.