Side Tower-Overhead Combination
Installation of Side Tower-Overhead
Combination units is easy when the correct
SEQUENCE is followed.
Your unit consists of the following
components:
1. Right Hand Side Tower
2. Left Hand Tower
3. Center Overhead
4. Lower Back Panel
5. Task Light
6. Tack Board
7. Temporary Overhead Support Fillers (2)
Installation Sequence:
A. Carefully Place and position Towers on
the worksurface. Separate them by the
width of the center overhead.
B. Install the lower back between the 2 side
towers using the 4 L-brackets in the
supplied kit. The side towers and back are
pre-drilled to locate the brackets. The
brackets should be on the front face of the
back, and will be covered later by the
tackboards.
C. Apply the supplied felt strips on the
bottoms of the 2 temporary overhead
supports. Place them felt side down, against
the Right and Left Side Towers, and clamp
them in place.
D. Carefully rest Center Overhead on the
supports, hold securely while threading the
hardware between the cabinets.
E. Secure inter-cabinet hardware.
1
2
3
4
7
7
5
A,B
C
D,E
Right
ON SITE