background image

13

81086_G-Vision 67_12-2021_ENG

4.2. Installation Environment and procedure

Avoid prolonged exposition to direct sunlight to avoid the risk 

of overheating the device.

The equipment is not intended for installation in contact with 

corrosive chemical compounds. Check the resistance of the 

front panel to a specific compound before installation.

Do not use tools of any kind (screwdrivers, etc.) to operate 

the touch screen of the panel.

The IP67 is guaranteed only if:

• max deviation from the plane surface to the cut-out: O0.5mm

• thickness of the case where is mounted the equipment: 

from 1,5mm to 6mm

• max surface roughness where the gasket is applied: O120 

um 

D

Usable cable

Max 3mm

GV_R-CAV-POE4-USB1.5

Max 10mm

Standard Ethernet

CAUTION

Tightening torque: 1000Ncm for nut, 130Ncm 

for screws

4.3. Safety instruction

For all installation notes, please refer to the 

Installation Guide provided with the product.

Содержание G-Vision 67-070

Страница 1: ...ree download from the GEFRAN website www gefran com Installers and or maintenance personnel are required to read this manual and to precisely follow the instructions contained in it and in its attachm...

Страница 2: ...notice The information contained in this document is provided for informational purposes only While efforts were made to verify the accuracy of the information contained in this documentation it is pr...

Страница 3: ...NS 7 4 TECHNICAL DATA 9 4 1 Dimensions 10 4 2 Installation Environment and procedure 13 4 3 Safety instruction 13 5 CONNECTIONS 14 5 1 Ethernet Port 14 6 POWER SUPPLY GROUNDING AND SHIELDING 15 7 BATT...

Страница 4: ...three levels of severity DANGER indicates a failure to observe safety rules and such failure may cause death or serious injuries SAFETY GUIDE ATTENTION indicates a failure to observe safety rules and...

Страница 5: ...lerator Runtime with OPC UA Server and Client Built in sensors temperature and acceleration Wi Fi Connection and NFC Device Full IP protection ideal for mounting arm installation 2 STANDARDS AND APPRO...

Страница 6: ...32495AA manufacturer address Gefran Soluzioni Srl Via Sebina 74 25050 Provaglio d Iseo BS Product Identification The product may be identified by the indications in the back cover You will have to kno...

Страница 7: ...0068 2 6 Shock 50 g 11 ms 3 pulses per axis EN 60068 2 27 Protection class IP67 requires appropriate connectorisand cables EN 60529 ELECTROMAGNETIC COMPATIBILITY EMC Radiated disturbance test Class A...

Страница 8: ...tion Surface resistance Chemical resistance of the front glass for an exposure time of 24 hours without visible changes Betadine 10 Povidone Solution Cola Electrode Gel Paste Hydrogen Peroxide 3 Solut...

Страница 9: ...nsors Temperature 3 Axis Accelerometer Buzzer Yes NFC ISO IEC 14443A Wi Fi IEEE 802 11a b g Ratings Power supply IEEE 802 3bt 4PPoE Power Consumption 10W 14W 21W 32W Battery Rechargeable Lithium batte...

Страница 10: ...81086_G Vision 67_12 2021_ENG 4 1 Dimensions MODEL A B C D G Vision 67 070 131 6mm 5 18 195 2mm 7 68 16 5mm 0 64 17mm 0 66 MODEL A B C D G Vision 67 101 183 1mm 7 20 264 5mm 10 41 16 5mm 0 64 17mm 0...

Страница 11: ...11 81086_G Vision 67_12 2021_ENG MODEL A B C D G Vision 67 156 248mm 9 76 398 6mm 15 69 26 5mm 1 04 17mm 0 66 MODEL A B C D G Vision 67 215 325 6mm 12 81 534 1mm 21 02 26 5mm 1 04 17mm 0 66 Rear view...

Страница 12: ...12 81086_G Vision 67_12 2021_ENG...

Страница 13: ...t use tools of any kind screwdrivers etc to operate the touch screen of the panel The IP67 is guaranteed only if max deviation from the plane surface to the cut out O0 5mm thickness of the case where...

Страница 14: ...rt The Ethernet port have two status indicators Please see description in figure Reserved Pin Description 1 TX 2 TX 3 RX 4 n c 5 n c 6 RX 7 n c 8 n c Red OFF Valid link has NOT been detected ON Valid...

Страница 15: ...the effects of noise due to electromagnetic interference on the control system The earth connection can also be made using the screws located near the connector A label helps identify the ground conn...

Страница 16: ...ble The following information is maintained by the battery hardware real time clock date and time Charge At first installation must be charged for 48 hours When the battery is fully charged it ensures...

Страница 17: ...ig 7 3 G Vision 67 156 IP67 Fig 7 4 G Vision 67 215 IP67 ATTENTION Dispose of batteries according to local regulations ATTENTION This device cannot be disposed of as a domestic waste but according to...

Страница 18: ...IDE software tools that must be properly installed on a computer running Microsoft Windows If you are planning to use your G Vision with Gf Project VX you must first initialize it using the System Set...

Страница 19: ...the context menu click and hold any unused area of the touchscreen for a few seconds Default hold time is 2 seconds Activation of Systems Settings in System Mode Normal operation If GF Designer HD ru...

Страница 20: ...date of Main OS is available only in System Mode the update of Config OS is only in User Mode Display Adjust display brightness configure automatic backlight turnoff and select HMI orientation 90 180...

Страница 21: ...21 81086_G Vision 67_12 2021_ENG 11 UNPACKING AND PACKING INSTRUCTIONS Fig 11 1 Fig 11 2 To repack the unit please follow the instructions backwards...

Страница 22: ...22 81086_G Vision 67_12 2021_ENG NOTE NOTE...

Страница 23: ...23 81086_G Vision 67_12 2021_ENG NOTE...

Страница 24: ...Gefran Soluzioni srl Via Sebina 74 25050 Provaglio d Iseo BS Italy Tel 39 0309888 1 Fax 39 0309839063 info gefran com http www gefran com www gefran com en gefran soluzioni...

Отзывы: