GEDA
®
Temporary Construction Hoist PH 650
Operating Manual
Page 33 of 64
BL148GB2017 / 11
10
Operation
10.1
Daily inspections before operating
To ensure safety when handling the hoist, the custodian / person
determined by the operating company must carry out a daily check of
certain areas of the hoist / parts.
Any defects identified must be immediately reported to the supervisor and
rectified. Defects may only be rectified by trained personnel responsible for
maintenance and servicing.
Make sure that no one is on the roof of the car or inside the enclosure.
Always carry out visual inspections before function checks. Operation is
prohibited until the defects are rectified. The following points must be
inspected daily.
10.1.1
Visual inspections
Complete hoist
•
Damaged load-bearing elements/deformation
•
Travel path of the hoist clear
•
Loose parts or parts fallen off.
•
Damage to the car
•
Oil/grease leaks
•
Discolourations and soiling, corrosion, cracks
•
Green control light comes on.
Warning and instruction notices
•
All present and legible
Safety equipment
•
All present
•
Functional
•
No tampering
Switch boxes
•
Burnt/scorched areas
•
Discolourations
•
Moisture
Содержание PH 650
Страница 1: ...Original operating manual Operating Manual Car PH 2032 PH 2737 PH 3240 Single Twin...
Страница 2: ......
Страница 3: ...GEDA Temporary Construction Hoist PH 650 Operating Manual Page 3 of 64 BL148GB2017 11...
Страница 4: ...GEDA Temporary Construction Hoist PH 650 Operating Manual Page 4 of 64 BL148GB2017 11...
Страница 8: ...GEDA Temporary Construction Hoist PH 650 Operating Manual Page 8 of 64 BL148GB2017 11...
Страница 63: ......