GEDA
®
3700 Z/ZP
Assembly
ML034 GB 2017 / 11
Page 45 of 60
Assembly Instructions
6.8.3.1 Mast tie [assembly 90° to the wall] for distance (B) 1.7 m to 2.8 m
(2 x item no. 54390)
Anchoring to the wall
The appropriate anchoring forces must be requested if the assembly
geometry shown is changed.
Tie requirements:
E/G0 = 6 m first mast tie
G = 12 m
vertical anchoring distance
H = 200 m
max. installation height
W = 10.5 m max. distance of last anchor
until the end of the mast
Z = 7.5 m
max. loading height above last
anchor
Z<1.5 m
The last anchor is
not
overrun
by the platform
Fy
4
Fy
1
B
Fy
2
Fx
2
Fx
1
Fx
3
Fx
4
B
Fy
3
A
A
W
H
Z
G2
G1
E/
G0