GEDA
®
1500 Z / ZP
Page 95 of 114
Rev.: 004
BL 076 GB
Translation of the original operating manual
2011 / 03
18.2
Maintenance schedule
Tasks to be carried out
Every we
ek
Every month
Quar
terly
Every ye
ar
Check the braking distance
X
1
Check the gear rack and drive pinion for lubrication and wear.
X
1
Check the trailing cable, mains supply cable and control cables
for damage.
X
1
Visual inspection of all defect devices and limit switches
X
Check the gear rack and drive pinion for wear
X
Check that the mast connecting bolts, EMERGENCY limit
switch approach bar and mast anchors/bolts are secured to the
mast and the building, tighten if necessary.
X
Rub the trailing cable with lubricant.
X
Check the grease quantity of the lubrication device and refill if
necessary
X
1
Notices present and easily legible
X
Functional check of the control points [manual control, electric
module (where present), platform control]
X
Functional test of the collision grille (optional)
X
Check the gear oil on the drives
X
Check the gear rack is positioned securely
X
Check motor brakes (air gap and pad thickness)
X
Check the rescue equipment
X
Check the overload position
X
Function check of the drop test control
X
Test the safety gear
X
Check the track rollers on the sliding carriage
X
Earth conductor test in accordance with EN 60204, Part 1
X²
Insulation test in accordance with EN 60204, Part 1
X²
1
Correspondingly more often in the case of frequent use or multi-shift operation.
²
Maximum test intervals, which could be much shorted depending on the place of
installation and national regulations.