12.2.6
Operating as transport platform
The transport platform can be operated from the platform only in dead
man's control. The platform only operates for as long as the operating
button is pushed.
The platform may be accessed and exited only at the installed landing
level safety gates above 2m.
The barriers for the ground fencing (where present), platform access point
of the ground station and the barrier with unloading ramp have to be
closed, locked in place and secured. The assembly guard must be
properly hung up.
The the main switch (on the switchbox of the ground station) has to be
switched on [position “
I
” (ON)].
The pusher plate (6) in front of the platform control has to be pushed up.
Insert the key (2) into the key switch and turn it right (position
1
) to activate
the control console.
Ascent
Press and hold the
UP
button (3) to move
the platform up.
Stopping the platform in its ascent:
Release
UP
button (3).
Platform reaches the upper limit switch
approach bar and stops automatically
(the
UP
limit switch switches off).
In an emergency press the
EMERGENCY STOP
button (1).
If the platform is to be exited at a transfer point (landing level safety gate)
for loading and unloading, then the platform must be stopped in such
a manner that it is level with the landing level gate.
Stop the platform with the
LANDING LEVEL STOP
button (5), which is
also pressed along with the
UP
button before the landing level safety
gate is reached.
First release the directional button (3) and then the
LANDING LEVEL STOP
button (or both at the same time).
NOTE
Always approach landing levels from below.
1
5
2
3
4
6