
GEDA
®
1500 Z / ZP
Page 24 of 114
Rev.: 004
BL 076 GB
Translation of the original operating manual
2011 / 03
D
Platform depth
G
Load capacity during assembly
A
1/2
Distance between wall fixtures
E
Platform width
H
Distance between the centre of the
circular mast tube to the centre of
the landing level gate crossbar
B
1/2
Distance from the centre of the circular
mast tube to the wall
F
Max. projecting mast
I
Max. distance of cable guides
C
1/2
Inclined position of attachment tube
P
Minimum distance between
closed assembly bridge and
fixing tube
0.1m
Q
Unloading hatch to the landing
level gate crossbar, centre
0.57m
T
Max. assembly height
100m
U
Height of 1st mast bracket
6m
V
Vertical distance to remaining
mast brackets
10m
W
Width of platform segment
1.44m
X
Distance from emergency limit
switch bar to mast end
1.26m
Y
Distance from landing level
floor to landing level limit switch
bar
0.25m
Z
Tightening torque of the mast
connection bolts
150Nm