GEDA
®
1500 Z / ZP
Page 21 of 114
Rev.: 004
BL 076 GB
Translation of the original operating manual
2011 / 03
3.9
Technical information for assembly
3.9.1
Foundation
The foundation must reliably transfer existing loads into the subsoil.
Therefore ensure the following points before each assembly job:
Evidence showing the load bearing capacity of the foundation
Evidence showing the load bearing capacity of the subsoil
Since the load capacity of the subsoil is often very difficult to estimate,
a specialist soil investigator should be called on if there is even the
slightest doubt, in particular for high/complicated superstructures.
The following points must be taken into account when assessing the
subsoil:
Permissible maximum ground pressure
Predicted
settlement
Predicted groundwater levels
Predicted thawing and frost processes
Construction activities expected in direct proximity to the installation
site
Steel plates and concrete can be used as load distributing base supports.
The foundation must be horizontal. The ground pressure data includes no
safety factors
3.9.2
Ground pressure
Mast weight per meter
32 kg
(with anchorings and cable guides)
Weight Base unit with platform
max. 1,840 kg
Rated load
max. 2,000 kg
Base area without base support
0.5 m²
(under both masts)
Assembly
height (m)
10 20 30 40 50 60 70 80 90 100
Weight
(kg)
6640 7280 7840 8490 9130 9690 10340 10980 11540 12190
Load bearing
capacity
(kN/ m
2
)
133 1146 157 170 183 194 207 220 231 244