8.1.2 Cleaning results
The cleaning result depends on the following factors:
●
Temperature
●
Time
●
Mechanics
●
Chemicals
●
Degree of soiling
These factors can be combined in such a way as to make an optimal cleaning result
probable.
8.2 Passivation
Before a system with long pipes and tanks is commissioned, it usually needs to be pas-
sivated.
Valve blocks are usually excepted from this.
Passivation is usually carried out with nitric acid (HNO
3
) at about 80 °C (176 °F) in a
concentration of 3 % and a contact time of 6 to 8 hours.
46 / 104 - 8.2 Passivation
0000000881 - 001 - EN-GB
Содержание VARIVENT X R Series
Страница 1: ...Operating Instructions Hygienic valves GEA VARIVENT Shuttle valve type X_R 2023 03 430BAL015128EN...
Страница 9: ...1 4 Declarations of conformity 1 4 Declarations of conformity 9 104...
Страница 12: ...12 104 1 4 Declarations of conformity 0000000881 001 EN GB...
Страница 40: ...40 104 5 5 Checking the pneumatic connection 0000000881 001 EN GB...
Страница 44: ...44 104 7 3 Shutdown 0000000881 001 EN GB...
Страница 88: ...88 104 9 7 Maintenance 0000000881 001 EN GB...
Страница 90: ...90 104 9 7 Maintenance 0000000881 001 EN GB...
Страница 98: ...98 104 12 2 Spare parts lists 0000000881 001 EN GB...
Страница 103: ...13 2 List of abbreviations 103 104...