
Fig.6:
Anchoring details
A
Drilled chemical anchor (M20)
B
Grouted anchor recesses (M20)
1
Installed chemical anchor before placing the base frame
2
Installing chemical anchor after placing the base frame (base frame cannot be removed
easily)
3
Drilling angle
1.3.5.3 Mounting the base frame on a concrete block
General
After the space between base frame and concrete base has been filled-up with a
filling grout, the package base frame must be secured tightly to the foundation
block or floor.
INSTALLATION AND PREPARATION FOR USE
INSTALLATION
0089288_imm_v_english_19
07.04.2021
19
Содержание Grasso 5
Страница 6: ...0089288_imm_v_english_19 6 07 04 2021 ...
Страница 8: ...0089288_imm_v_english_19 8 07 04 2021 ...
Страница 10: ...0089288_imm_v_english_19 10 07 04 2021 ...