Decommissioning
Final Decommissioning / Disposal
7159-9001-108
01. February 2020
10
Decommissioning
10.1
Special Personnel Qualifications
Decommissioning may only be performed by specially qualified personnel in
accordance with the safety instructions.
See also the section on ”Personnel qualification”.
10.2
Safety Instructions
To avoid damage to property and/or life-threatening injury to people during
shut-down, the following points must always be observed:
● First of all, make the operating area for decommissioning completely safe.
● Read the ”Safety” section as well.
10.3
Particular hazards
● Components which have not been set down correctly may fall off or twist.
● There is a risk of injury from open components / tools / etc. with sharp edges.
10.4
Temporary decommissioning
● Switch off the power supply to the transceiver
10.5
Final Decommissioning / Disposal
After final decommissioning, handle all components properly and dispose of them
in accordance with valid local regulations on waste disposal and re-utilization.