Mounting
Installation of the frame
7159-9001-108
01. February 2020
Installation procedure
220
20
250,260
A
1. Insert bushing into the gate (10, 110, 220)
2. Insert the gate into the gate frame.
Note:
Insert gate with grease (A)
3. Install the gate stop accordingly (30)
4. Cushioning the segregation gate
Cut the hose lengthways (250)
Push on, position and secure the hose (260)
250,260
10
5. Mount pipe bend. (20)
Only hand-tighten the nuts.