Mounting
Installation of the frame
7159-9001-108
01. February 2020
Installation procedure
1. Screw pipe bends together (10, 30)
2. Insert bushing (320)
3. Insert gate frame and secure with split pin (20, 230)
Note:
Insert gate with grease (A)
4. Mount pipes on pipe bends (50, 60)
Note:
Grease piping when fitting (B)
5. Cushioning the entrance gate
Push on, position and secure the hose (330, 340)
6. Install U-steel section (40)
7. Install flat steel section (90)
8. Fitting the vacuum cylinder (70)
9. Put safety signs up on both sides of
the position shown. (0180, 0190)
0190
0180