
8
Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
REMOVE THE PACKAGING
• Remove packages from the “V” shaped cardboard
section. Remove shipping pads.
• Lift the hood out of the box.
IMPORTANT:
Lift the hood by grasping
the outside edges of the exhaust opening on the top.
• The vent hood motor is shipped secured to the skid with
4 screws. Locate and remove 2 screws on each side of the
motor. Discard the shipping skid and screws.
• From the inside of the hood, loosen (do not remove)
the 2 screws holding the wood mounting support to the
back of the hood. Remove and set aside the mounting
support with screws for later installation. DO NOT
DISCARD.
• Remove tape and packing material from the hood and
all supplied parts.
Tools
• Pencil and tape measure
• Spirit level
• Wire cutter/stripper
• Wire nuts
• Electric drill and appropriate bits
• Phillips and flat blade screwdrivers
• Torx
®
T-20 screwdriver
• 1/4" pivoting hex socket
• Flashlight
• Metal Snips
• Caulking
• Pliers
• Safety glasses
• Duct tape
Additional Materials:
• 120V 60Hz. 15 or 20 Amp, 2 wire with ground.
Properly grounded branch circuit.
• Strain relief for junction cover.
• 10" round metal duct, length to suit installation.
Hood
Parts
Wood
Mounting
Support
Motor
Mounted
on Skid
Shipping Carton
Duct
Transition