GE ZV48T Скачать руководство пользователя страница 13

13

Installation Instructions

STEP 3  CONNECT DUCTWORK

• Install ductwork, making connections in direction of

airflow as illustrated.

• Secure joints in ductwork with sheetmetal screws.
• Wrap all duct joints with duct tape for an airtight seal.
• Use duct tape to seal the flange connection. Reach

inside the hood and push the damper up to be sure it
moves freely.

STEP 4  CONNECT ELECTRICAL

STEP 5  INSTALL DUCT COVERS

Note: 

For easier handling, remove cardboard insert

after film is peeled off.

Remove protective film from duct covers. If more than
one duct cover is used, secure each piece together with
screws provided.
• Place the duct cover(s) on top of the hood.
• From inside the hood, secure the duct cover to the

top with the small Torx

®

 screws supplied with the

covers.

Verify that power is turned off at the source.

WARNING: 

If house wiring is not 2-wire

with a ground wire, a ground must be provided by the
installer. When house wiring is aluminum, be sure to
use U.L. approved anti-oxidant compound and alumi-
num-to-copper connectors.

ATTENTION –

 Si le câblage de la

maison n’est pas du type à deux fils avec un fil de
terre, l’installateur doit fournir un circuit de terre.
Quand les fils de la maison sont en aluminium, il
prendre soin d’utiliser de la pâte antioxidation
approuvée par UL et des connecteurs pour
l’aluminium-cuivre.

• Use wire nuts to connect incoming ground to green,

white to white and black to black.

• Push wires into junction box and replace cover. Be

sure wires are not pinched.

White

Ground

Black

Remove

Junction Box

Cover

Insert Power
Conduit Thru
Strain Relief

and Tighten

Use UL Listed

Wire Nuts

A

B

C

Screw

Duct Tape
Over Seam 
and Screw

Air Flow

Duct Tape

Over Transition

Содержание ZV48T

Страница 1: ...bring good things to life If you have questions call 800 GE CARES or visit our website at www monogram com Installation Instructions 30 36 and 48 Professional Vent Hoods Models ZV48T ZV48S ZV36T ZV36...

Страница 2: ...in accordance with National Electrical Code ANSI NFPA 70 1990 or latest edition CAUTION To reduce risk of fire and to properly exhaust air be sure to duct air outside Do not vent exhaust air into spac...

Страница 3: ...5 Duct Fittings 6 Using Duct Cover Accessories 7 Tools and Materials Required 8 Remove the packaging 8 Parts Provided 9 Step 1 Determine Ductwork and Wiring Locations 10 Step 2A Install Hood Onto Wal...

Страница 4: ...r the duct cover corresponding to your model In this installation the ductwork running from the top of the hood will be concealed in the soffit or upper cabinetry For this installation a decorative du...

Страница 5: ...soffit Stack one or more duct covers over the top of the hood to reach your ceiling height POWER SUPPLY IMPORTANT Please read carefully WARNING FOR PERSONAL SAFETY THIS APPLIANCE MUST BE PROPERLY GRO...

Страница 6: ...ucting is used all the equivalent feet values in the table should be doubled The flexible metal duct should be straight and smooth and extended as much as possible Do NOT use flexible plastic ducting...

Страница 7: ...inal framing and wall finishing This will help to accurately locate studs ductwork and electrical service Read these examples carefully to determine the need for one or more 6 or 12 duct covers A B C...

Страница 8: ...ing support to the back of the hood Remove and set aside the mounting support with screws for later installation DO NOT DISCARD Remove tape and packing material from the hood and all supplied parts To...

Страница 9: ...DWARE PACKAGE Locate and check contents Screws shown actual size 6 Screws to secure hood to the wood support 2 secured to wood support Torx 20 4 screws to secure the transition to the hood outlet on t...

Страница 10: ...GH REAR WALL Measure the supplied duct transition with any straight run length of duct used plus 90 elbow height Draw horizontal line on the wall intersecting the centerline House Wiring Location The...

Страница 11: ...he wood support IMPORTANT Remove shipping tape from damper and check that damper moves freely Duct Transition Top of Hood SKIP THIS STEP IF INSTALLING BENEATH A SOFFIT OR CABINET GO TO STEP 2B Locate...

Страница 12: ...in the top view illustration Install Transition Onto Top of Hood Place the transition piece over the hood exhaust and secure with 4 screws provided Use duct tape to seal the connection Check to be sur...

Страница 13: ...ed with the covers Verify that power is turned off at the source WARNING If house wiring is not 2 wire with a ground wire a ground must be provided by the installer When house wiring is aluminum be su...

Страница 14: ...lock washer Screw is marked with red paint Plug connector into the motor IMPORTANT Connector ends are designed to mate only one way Match flat and round connectors as shown Spring Clip Outlet Attachm...

Страница 15: ...stand offs with the screw hole towards the inside of the hood Secure the rod to the stand offs with the supplied Allen wrench Follow the same procedure on the opposite side Screw Stand offs Into Hood...

Страница 16: ...ur area call 1 800 444 1845 Note Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice Pub No 49 80151...

Отзывы: