GE ZV48T Скачать руководство пользователя страница 12

12

Installation Instructions

STEP 2B  Alternate Mounting Method

“A”

“B”

Centerline to Stud

Hood Width

and Keyhole Slots

At the Top

ZV48T

19-9/16"

38"

ZV48S

23-9/16"

47-15/16"

ZV36T

13-9/16"

26"

ZV36S

17-9/16"

35-15/16"

ZV30T

10-9/16"

20"

ZV30S

14-9/16"

29-15/16"

INSTALL HOOD TO SOFFIT OR BENEATH CABINETS

SKIP THIS STEP IF USING WALL MOUNTING
METHOD

When necessary, the hood may be installed so that it is
supported by the soffit.
• The soffit should be constructed with 2 x 4’s.
• Determine the installation location on the wall.
• Continue the centerline forward on the bottom of

the cabinet or soffit.

• The opening above the hood should allow for the 10"

round duct and clearance to slide the hood back
against the wall.

A

Requires 10-1/2" Min.
Opening For Ductwork

and Hood Installation

A

• The 2 x 4 studs must be located as shown in the chart,

Dim. A.  to accept mounting screws.

IMPORTANT: Soffit framing must be capable
of supporting up to 150 lbs.

• Drill 1/8" pilot holes  into the studs at the locations

shown in the top view illustration.

Install Transition Onto Top of Hood

• Place the transition piece over the hood exhaust and

secure with 4 screws provided.

• Use duct tape to seal the connection. Check to be sure

the damper moves freely.

Mount Hood onto Soffit or Cabinet

Note: 

If mounting to the underside of a cabinet with a

recessed bottom, install shims to fill the gap.

IMPORTANT:

 Remove

shipping tape from
damper and check that
damper moves freely.

Duct

Transition

Top of

Hood

• Drive mounting screws into the studs until they

protrude 1/4". The 1/4" gap will provide clearance to
engage the keyhole slots in the top of the hood.

• Lift hood to installation position. Locate house wiring

and route through the knockout  (from the back or
top of the hood).

• Lift hood onto mounting screws. Slide back against

the rear wall.

• Tighten mounting screws.

IMPORTANT: For additional support and to mini-
mize vibration during operation, the hood must be
secured to the back wall. Use wall anchors to fasten
bottom back of hood to the wall.

1/4" Gap

Push Back
to Wall

Add Shims
If Bottom
Is Recessed

Back
Wall

Cabinet

or

Soffit

Engage Top
Keyhole Slots

2"

7-1/2"

A

C

B

2-9/16"

8"

8-1/8"

6"

Back of Hood

Top View

Front of Hood

Содержание ZV48T

Страница 1: ...bring good things to life If you have questions call 800 GE CARES or visit our website at www monogram com Installation Instructions 30 36 and 48 Professional Vent Hoods Models ZV48T ZV48S ZV36T ZV36...

Страница 2: ...in accordance with National Electrical Code ANSI NFPA 70 1990 or latest edition CAUTION To reduce risk of fire and to properly exhaust air be sure to duct air outside Do not vent exhaust air into spac...

Страница 3: ...5 Duct Fittings 6 Using Duct Cover Accessories 7 Tools and Materials Required 8 Remove the packaging 8 Parts Provided 9 Step 1 Determine Ductwork and Wiring Locations 10 Step 2A Install Hood Onto Wal...

Страница 4: ...r the duct cover corresponding to your model In this installation the ductwork running from the top of the hood will be concealed in the soffit or upper cabinetry For this installation a decorative du...

Страница 5: ...soffit Stack one or more duct covers over the top of the hood to reach your ceiling height POWER SUPPLY IMPORTANT Please read carefully WARNING FOR PERSONAL SAFETY THIS APPLIANCE MUST BE PROPERLY GRO...

Страница 6: ...ucting is used all the equivalent feet values in the table should be doubled The flexible metal duct should be straight and smooth and extended as much as possible Do NOT use flexible plastic ducting...

Страница 7: ...inal framing and wall finishing This will help to accurately locate studs ductwork and electrical service Read these examples carefully to determine the need for one or more 6 or 12 duct covers A B C...

Страница 8: ...ing support to the back of the hood Remove and set aside the mounting support with screws for later installation DO NOT DISCARD Remove tape and packing material from the hood and all supplied parts To...

Страница 9: ...DWARE PACKAGE Locate and check contents Screws shown actual size 6 Screws to secure hood to the wood support 2 secured to wood support Torx 20 4 screws to secure the transition to the hood outlet on t...

Страница 10: ...GH REAR WALL Measure the supplied duct transition with any straight run length of duct used plus 90 elbow height Draw horizontal line on the wall intersecting the centerline House Wiring Location The...

Страница 11: ...he wood support IMPORTANT Remove shipping tape from damper and check that damper moves freely Duct Transition Top of Hood SKIP THIS STEP IF INSTALLING BENEATH A SOFFIT OR CABINET GO TO STEP 2B Locate...

Страница 12: ...in the top view illustration Install Transition Onto Top of Hood Place the transition piece over the hood exhaust and secure with 4 screws provided Use duct tape to seal the connection Check to be sur...

Страница 13: ...ed with the covers Verify that power is turned off at the source WARNING If house wiring is not 2 wire with a ground wire a ground must be provided by the installer When house wiring is aluminum be su...

Страница 14: ...lock washer Screw is marked with red paint Plug connector into the motor IMPORTANT Connector ends are designed to mate only one way Match flat and round connectors as shown Spring Clip Outlet Attachm...

Страница 15: ...stand offs with the screw hole towards the inside of the hood Secure the rod to the stand offs with the supplied Allen wrench Follow the same procedure on the opposite side Screw Stand offs Into Hood...

Страница 16: ...ur area call 1 800 444 1845 Note Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice Pub No 49 80151...

Отзывы: