GE ZV48T Скачать руководство пользователя страница 10

10

• Use a level to draw the cooktop centerline location.

Draw the line to ceiling height.

• Measure desired distance from the bottom of the

hood to the cooking surface, 30" min. to 36" max.

Note:

 If you are installing the hood with duct covers, be sure to read

“Using Duct Cover Accessories” page 7. Exact installation height
may be determined by use of one or more duct covers.

• Use a level to draw a straight horizontal pencil line

indicating the bottom of the hood.

• From the line indicating the bottom of the hood,

measure 15-3/8" up and draw another line for the
location of the wood support. See illustration.

FOR VERTICAL (Straight Up) DUCTING:
• Use a level to draw a centerline from the bottom of

the hood to ceiling or soffit.

• If venting out the ceiling, extend the centerline

forward on the ceiling or soffit.

• Locate the centerline of a 10-1/2" hole on the ceiling

or soffit by measuring 6" from the wall.

STEP 1  DETERMINE HOOD, DUCTWORK AND WIRING LOCATIONS

FOR DUCTING THROUGH REAR WALL:
• Measure the supplied duct transition with any straight

run length of duct used, plus 90

°

  elbow height. Draw

horizontal line on the wall intersecting the centerline.

House Wiring Location:

• The junction box is fastened to the back of the hood

on the right side.

Installation Instructions

Alternate Knockout Locations

If the installation requires, the junction box can be
relocated from the back to the top of the hood. Remove
3 screws, align box to top knockout and secure with
original screws.
• Remove junction box cover and knockout. Install strain

relief.

18-13/16" for 48" Models
12-13/16" for 36" Models

9-13/16" for 30" Models

Electrical

Area

8-3/8"

6-1/2"

18-1/16" for 48" Models
12-1/16" for 36" Models
9-1/16" for 30" Models

*Depending on

Hood width and
Installation Height.

Top of Hood

Bottom of Hood

18" 

15-3/8"

Wood

Support

*House Wiring

Location

• The recessed back side of the hood provides a large

area for the house wiring to exit the wall and be
routed to the rear knockout and junction box.

• The location for the house wiring depends on the

installation height of the hood and the width of the
hood.

• Remove junction box cover and knockout. Install

strain relief.

Содержание ZV48T

Страница 1: ...bring good things to life If you have questions call 800 GE CARES or visit our website at www monogram com Installation Instructions 30 36 and 48 Professional Vent Hoods Models ZV48T ZV48S ZV36T ZV36...

Страница 2: ...in accordance with National Electrical Code ANSI NFPA 70 1990 or latest edition CAUTION To reduce risk of fire and to properly exhaust air be sure to duct air outside Do not vent exhaust air into spac...

Страница 3: ...5 Duct Fittings 6 Using Duct Cover Accessories 7 Tools and Materials Required 8 Remove the packaging 8 Parts Provided 9 Step 1 Determine Ductwork and Wiring Locations 10 Step 2A Install Hood Onto Wal...

Страница 4: ...r the duct cover corresponding to your model In this installation the ductwork running from the top of the hood will be concealed in the soffit or upper cabinetry For this installation a decorative du...

Страница 5: ...soffit Stack one or more duct covers over the top of the hood to reach your ceiling height POWER SUPPLY IMPORTANT Please read carefully WARNING FOR PERSONAL SAFETY THIS APPLIANCE MUST BE PROPERLY GRO...

Страница 6: ...ucting is used all the equivalent feet values in the table should be doubled The flexible metal duct should be straight and smooth and extended as much as possible Do NOT use flexible plastic ducting...

Страница 7: ...inal framing and wall finishing This will help to accurately locate studs ductwork and electrical service Read these examples carefully to determine the need for one or more 6 or 12 duct covers A B C...

Страница 8: ...ing support to the back of the hood Remove and set aside the mounting support with screws for later installation DO NOT DISCARD Remove tape and packing material from the hood and all supplied parts To...

Страница 9: ...DWARE PACKAGE Locate and check contents Screws shown actual size 6 Screws to secure hood to the wood support 2 secured to wood support Torx 20 4 screws to secure the transition to the hood outlet on t...

Страница 10: ...GH REAR WALL Measure the supplied duct transition with any straight run length of duct used plus 90 elbow height Draw horizontal line on the wall intersecting the centerline House Wiring Location The...

Страница 11: ...he wood support IMPORTANT Remove shipping tape from damper and check that damper moves freely Duct Transition Top of Hood SKIP THIS STEP IF INSTALLING BENEATH A SOFFIT OR CABINET GO TO STEP 2B Locate...

Страница 12: ...in the top view illustration Install Transition Onto Top of Hood Place the transition piece over the hood exhaust and secure with 4 screws provided Use duct tape to seal the connection Check to be sur...

Страница 13: ...ed with the covers Verify that power is turned off at the source WARNING If house wiring is not 2 wire with a ground wire a ground must be provided by the installer When house wiring is aluminum be su...

Страница 14: ...lock washer Screw is marked with red paint Plug connector into the motor IMPORTANT Connector ends are designed to mate only one way Match flat and round connectors as shown Spring Clip Outlet Attachm...

Страница 15: ...stand offs with the screw hole towards the inside of the hood Secure the rod to the stand offs with the supplied Allen wrench Follow the same procedure on the opposite side Screw Stand offs Into Hood...

Страница 16: ...ur area call 1 800 444 1845 Note Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice Pub No 49 80151...

Отзывы: