GE H
EALTHCARE
RAFT
V
OLUSON
E8 / V
OLUSON
E6
D
IRECTION
KTD102576, R
EVISION
7
DRAFT (A
UGUST
23, 2012)
S
ERVICE
M
ANUAL
2-2
Section 2-2 - General Console Requirements
Section 2-2
General Console Requirements
2-2-1
Environmental Requirements
2-2-1-1
Cooling
The cooling requirement for the Voluson E8 / Voluson E6 is 3410 BTU/hr. This figure does not include
cooling needed for lights, people, or other equipment in the room.
NOTE:
Each person in the room places an additional 300 BTU/hr. demand on the cooling system.
2-2-1-2
Lighting
Bright light is needed for system installation, updates and repairs. However, operator and patient
comfort may be optimized if the room light is subdued and indirect. Therefore a combination lighting
system (dim/bright) is recommended. Keep in mind that lighting controls and dimmers can be a source
of EMI which could degrade image quality. These controls should be selected to minimize possible
interference.
2-2-2
Electrical Requirements
NOTE:
GE Healthcare requires a dedicated power and ground for the proper operation of its Ultrasound
equipment. This dedicated power shall originate at the last distribution panel before the system.
The dedicated line shall consist of one phase, a neutral (not shared with any other circuit), and a full
size Ground wire from the distribution panel to the Ultrasound outlet.
NOTE:
Please note that image artifacts can occur, if at any time within the facility, the Ground from the main
facility's incoming power source to the Ultrasound system is only a conduit.
Table 2-1
Environmental Requirements
Operating
Temperature
Operating
Humidity
Heat Dissipation
Storage
Temperature
Storage Humidity
10 to 30
o
C
(50 to 86
o
F)
30 to 80% rH
non-condensing
3410 BTU/hour
-10 to 40
o
C
(14 to 104
o
F)
< 90% rH non-
condensing
CAUTION
!! CAUTION:
If the system has been in storage or has been transported, please see the acclimation requirements
before
powering
ON
and/or using the system (see: