GE Multilin
T60 Transformer Protection System
5-107
5 SETTINGS
5.4 SYSTEM SETUP
5
c) CALIBRATION
PATH: SETTINGS
SYSTEM SETUP
PHASOR...
PHASOR MEASUREMENT UNIT 1(4)
PMU 1 CALIBRATION
This menu contains user angle calibration data for the phasor measurement unit (PMU). This data is combined with the fac-
tory adjustments to shift the phasors for better accuracy.
•
PMU 1 VA... IG CALIBRATION ANGLE
: These settings recognize applications with protection class voltage and cur-
rent sources, and allow the user to calibrate each channel (four voltages and four currents) individually to offset errors
introduced by VTs, CTs, and cabling. The setting values are effectively added to the measured angles. Therefore, enter
a positive correction of the secondary signal lags the true signal; and negative value if the secondary signal leads the
true signal.
•
PMU 1 SEQ VOLT SHIFT ANGLE
: This setting allows correcting positive- and negative-sequence voltages for vector
groups of power transformers located between the PMU voltage point, and the reference node. This angle is effectively
added to the positive-sequence voltage angle, and subtracted from the negative-sequence voltage angle. Note that:
1.
When this setting is not “0°”, the phase and sequence voltages will not agree. Unlike sequence voltages, the
phase voltages cannot be corrected in a general case, and therefore are reported as measured.
2.
When receiving synchrophasor data at multiple locations, with possibly different reference nodes, it can be more
beneficial to allow the central locations to perform the compensation of sequence voltages.
3.
This setting applies to PMU data only. The T60 calculates symmetrical voltages independently for protection and
control purposes without applying this correction.
4.
When connected to line-to-line voltages, the PMU calculates symmetrical voltages with the reference to the AG
voltage, and not to the physically connected AB voltage (see the
Metering Conventions
section in Chapter 6).
•
PMU 1 SEQ CURR SHIFT ANGLE
: This setting allows correcting positive and negative-sequence currents for vector
groups of power transformers located between the PMU current point and the reference node. The setting has the
same meaning for currents as the
PMU 1 SEQ VOLT SHIFT ANGLE
setting has for voltages. Normally, the two correcting
angles are set identically, except rare applications when the voltage and current measuring points are located at differ-
ent windings of a power transformer.
PMU 1
CALIBRATION
PMU 1 VA CALIBRATION
ANGLE: 0.00°
Range: –5.00 to 5.00° in steps of 0.05
MESSAGE
PMU 1 VB CALIBRATION
ANGLE: 0.00°
Range: –5.00 to 5.00° in steps of 0.05
MESSAGE
PMU 1 VC CALIBRATION
ANGLE: 0.00°
Range: –5.00 to 5.00° in steps of 0.05
MESSAGE
PMU 1 VX CALIBRATION
ANGLE: 0.00°
Range: –5.00 to 5.00° in steps of 0.05
MESSAGE
PMU 1 IA CALIBRATION
ANGLE: 0.00°
Range: –5.00 to 5.00° in steps of 0.05
MESSAGE
PMU 1 IB CALIBRATION
ANGLE: 0.00°
Range: –5.00 to 5.00° in steps of 0.05
MESSAGE
PMU 1 IC CALIBRATION
ANGLE: 0.00°
Range: –5.00 to 5.00° in steps of 0.05
MESSAGE
PMU 1 IG CALIBRATION
ANGLE: 0.00°
Range: –5.00 to 5.00° in steps of 0.05
MESSAGE
PMU 1 SEQ VOLT SHIFT
ANGLE: 0°
Range: –180 to 180° in steps of 30
MESSAGE
PMU 1 SEQ CURR SHIFT
ANGLE: 0°
Range: –180 to 180° in steps of 30
Содержание UR T60
Страница 10: ...x T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Страница 14: ...xiv T60 Transformer Protection System GE Multilin 0 1 BATTERY DISPOSAL 0 BATTERY DISPOSAL 0 ...
Страница 34: ...1 20 T60 Transformer Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 436: ...5 298 T60 Transformer Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 492: ...8 18 T60 Transformer Protection System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 510: ...9 18 T60 Transformer Protection System GE Multilin 9 6 COMMISSIONING TEST TABLES 9 COMMISSIONING 9 ...
Страница 678: ...C 30 T60 Transformer Protection System GE Multilin C 7 LOGICAL NODES APPENDIX C C ...
Страница 688: ...D 10 T60 Transformer Protection System GE Multilin D 1 IEC 60870 5 104 PROTOCOL APPENDIX D D ...
Страница 700: ...E 12 T60 Transformer Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...