GE Multilin
C70 Capacitor Bank Protection and Control System
7-9
7 COMMANDS AND TARGETS
7.2 TARGETS
7
b) MAJOR SELF-TEST ERROR MESSAGES
The major self-test errors are listed and described below.
•
Latched target message
: Yes.
•
Description of problem
: Module hardware failure detected.
•
How often the test is performed
: Module dependent.
•
What to do
: Contact the factory and supply the failure code noted in the display. The “xxx” text identifies the failed mod-
ule (for example, F8L).
•
Latched target message
: Yes.
•
Description of problem
: One or more installed hardware modules is not compatible with the C70 order code.
•
How often the test is performed
: Module dependent.
•
What to do
: Contact the factory and supply the failure code noted in the display. The “xxx” text identifies the failed mod-
ule (for example, F8L).
•
Latched target message
: No.
•
Description of problem
: The configuration of modules does not match the order code stored in the C70.
•
How often the test is performed
: On power up. Afterwards, the backplane is checked for missing cards every five sec-
onds.
•
What to do
: Check all modules against the order code, ensure they are inserted properly, and cycle control power. If
the problem persists, contact the factory.
•
Latched target message
: No.
•
Description of problem
: A FlexLogic™ equation is incorrect.
•
How often the test is performed
: The test is event driven, performed whenever FlexLogic™ equations are modified
.
•
What to do
: Finish all equation editing and use self tests to debug any errors.
•
Latched target message
: No.
•
Description of problem
: The
PRODUCT SETUP
ÖØ
INSTALLATION
Ö
RELAY SETTINGS
setting indicates the C70 is not pro-
grammed.
•
How often the test is performed
: On power up and whenever the
PRODUCT SETUP
ÖØ
INSTALLATION
Ö
RELAY SETTINGS
setting is altered
.
•
What to do
: Program all settings and then set
PRODUCT SETUP
ÖØ
INSTALLATION
Ö
RELAY SETTINGS
to “Programmed”.
MODULE FAILURE___:
Contact Factory (xxx)
INCOMPATIBLE H/W:
Contact Factory (xxx)
EQUIPMENT MISMATCH:
with 2nd line detail
FLEXLOGIC ERROR:
with 2nd line detail
UNIT NOT PROGRAMMED:
Check Settings
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...