GE Multilin
C70 Capacitor Bank Protection and Control System
1-5
1 GETTING STARTED
1.3 ENERVISTA UR SETUP SOFTWARE
1
1.3ENERVISTA UR SETUP SOFTWARE
1.3.1 PC REQUIREMENTS
The faceplate keypad and display or the EnerVista UR Setup software interface can be used to communicate with the relay.
The EnerVista UR Setup software interface is the preferred method to edit settings and view actual values because the PC
monitor can display more information in a simple comprehensible format.
The following minimum requirements must be met for the EnerVista UR Setup software to properly operate on a PC.
•
Pentium class or higher processor (Pentium II 300 MHz or higher recommended)
•
Windows 95, 98, 98SE, ME, NT 4.0 (Service Pack 4 or higher), 2000, XP
•
Internet Explorer 4.0 or higher
•
128 MB of RAM (256 MB recommended)
•
200 MB of available space on system drive and 200 MB of available space on installation drive
•
Video capable of displaying 800 x 600 or higher in high-color mode (16-bit color)
•
RS232 and/or Ethernet port for communications to the relay
The following qualified modems have been tested to be compliant with the C70 and the EnerVista UR Setup software.
•
US Robotics external 56K FaxModem 5686
•
US Robotics external Sportster 56K X2
•
PCTEL 2304WT V.92 MDC internal modem
1.3.2 INSTALLATION
After ensuring the minimum requirements for using EnerVista UR Setup are met (see previous section), use the following
procedure to install the EnerVista UR Setup from the enclosed GE EnerVista CD.
1.
Insert the GE EnerVista CD into your CD-ROM drive.
2.
Click the
Install Now
button and follow the installation instructions to install the no-charge EnerVista software.
3.
When installation is complete, start the EnerVista Launchpad application.
4.
Click the
IED Setup
section of the
Launch Pad
window.
5.
In the EnerVista Launch Pad window, click the
Add Product
button and select the “C70 Capacitor Bank Protection and
Control System” from the Install Software window as shown below. Select the “Web” option to ensure the most recent
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...