GE Multilin
C70 Capacitor Bank Protection and Control System
4-13
4 HUMAN INTERFACES
4.3 FACEPLATE INTERFACE
4
4.3FACEPLATE INTERFACE
4.3.1 FACEPLATE
a) ENHANCED FACEPLATE
The front panel interface is one of two supported interfaces, the other interface being EnerVista UR Setup software. The
front panel interface consists of LED panels, an RS232 port, keypad, LCD display, control pushbuttons, and optional user-
programmable pushbuttons.
The faceplate is hinged to allow easy access to the removable modules.
Figure 4–15: UR-SERIES ENHANCED FACEPLATE
b) STANDARD FACEPLATE
The front panel interface is one of two supported interfaces, the other interface being EnerVista UR Setup software. The
front panel interface consists of LED panels, an RS232 port, keypad, LCD display, control pushbuttons, and optional user-
programmable pushbuttons.
The faceplate is hinged to allow easy access to the removable modules. There is also a removable dust cover that fits over
the faceplate which must be removed in order to access the keypad panel. The following figure shows the horizontal
arrangement of the faceplate panels.
Figure 4–16: UR-SERIES STANDARD HORIZONTAL FACEPLATE PANELS
Five column LED indicator panel
Display
User-programmable pushbuttons 1 to 16
842810A1.CDR
Keypad
Front panel
RS232 port
LED panel 1
LED panel 2
Display
User-programmable
pushbuttons 1 to 12
Keypad
Front panel
RS232 port
Small user-programmable
(control) pushbuttons 1 to 7
LED panel 3
827801A7.CDR
Содержание UR Series C70
Страница 2: ......
Страница 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Страница 30: ...1 20 C70 Capacitor Bank Protection and Control System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Страница 124: ...4 30 C70 Capacitor Bank Protection and Control System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Страница 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Страница 396: ...8 18 C70 Capacitor Bank Protection and Control System GE Multilin 8 3 ENERVISTA SECURITY MANAGEMENT SYSTEM 8 SECURITY 8 ...
Страница 414: ...9 18 C70 Capacitor Bank Protection and Control System GE Multilin 9 1 OVERVIEW 9 THEORY OF OPERATION 9 ...
Страница 436: ...10 22 C70 Capacitor Bank Protection and Control System GE Multilin 10 4 SETTING EXAMPLE 10 APPLICATION OF SETTINGS 10 ...
Страница 547: ...GE Multilin C70 Capacitor Bank Protection and Control System B 79 APPENDIX B B 4 MEMORY MAPPING B ...
Страница 548: ...B 80 C70 Capacitor Bank Protection and Control System GE Multilin B 4 MEMORY MAPPING APPENDIXB B ...
Страница 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...
Страница 598: ...E 12 C70 Capacitor Bank Protection and Control System GE Multilin E 2 DNP POINT LISTS APPENDIXE E ...