MAINTENANCE: Electrical Safety Tests
3-14
Solar 7000/8000/View Patient Monitor
Revision J
414993-001
NOTE
If either reading is greater than 50 µA (0.05 volts on the
DMM), the device fails this test. Contact GE Medical
Systems Information Technologies Technical Support.
7.
Change the GND switch to the Closed position.
8.
Read the leakage current indicated on the DMM.
9.
Change the leakage current switch to the RVS position.
10. Read the leakage current indicated on the DMM.
NOTE
If either reading is greater than 10 µA (0.01 volts on the
DMM), the device fails this test. Contact GE Medical
Systems Information Technologies Technical Support.
11. Set the power switch of the device to OFF.
NOTE
The AAMI and IEC single fault condition (ground open)
is 50 µA, whereas the normal condition (ground closed) is
less.
Patient (Sink)
Leakage Current Test
(Mains Voltage on the
Applied Part)
This procedure only applies to Class I (grounded/earthed) equipment,
and measures the leakage current from a mains voltage source into the
ECG/RESP connector.
1.
Configure the leakage tester like the circuit shown below with GND
switch CLOSED and polarity switch NORM.
Power Cord
Leakage Tester
NORM
RVS
ECG Test Body
or ECG Cable
HIGH
LOW
GND
1K
0.15µF
10
Power Cord
Device
Under
Test
DMM set to measure AC voltage
GND
DMM
Closed
(Keep cable length as
short as possible.)
120K
Содержание Solar 7000
Страница 1: ...Solar 7000 8000 SolarView Patient Monitor Field Service Manual 414993 001 Revision J ...
Страница 10: ...CONTENTS viii Solar 7000 8000 View Patient Monitor Revision H 414993 001 For your notes ...
Страница 11: ...Revision J Solar 7000 8000 View Patient Monitor 1 1 414993 001 1 INTRODUCTION ...
Страница 12: ...INTRODUCTION 1 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Страница 19: ...Revision J Solar 7000 8000 View Patient Monitor 2 1 414993 001 2 EQUIPMENT OVERVIEW ...
Страница 20: ...EQUIPMENT OVERVIEW 2 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Страница 63: ...Revision J Solar 7000 8000 View Patient Monitor 3 1 414993 001 3 MAINTENANCE ...
Страница 64: ...MAINTENANCE 3 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Страница 84: ...MAINTENANCE Checkout Procedure 3 22 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Страница 87: ...Revision J Solar 7000 8000 View Patient Monitor 4 1 414993 001 4 TROUBLESHOOTING ...
Страница 88: ...4 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Страница 135: ...Revision J Solar 7000 8000 View Patient Monitor 5 1 414993 001 5 CALIBRATION ...
Страница 136: ...CALIBRATION 5 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Страница 153: ...Revision J Solar 7000 8000 View Patient Monitor 6 1 414993 001 6 CONFIGURATION ...
Страница 154: ...6 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Страница 182: ...CONFIGURATION Advanced User Procedures 6 30 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Страница 183: ...Revision J Solar 7000 8000 View Patient Monitor 7 1 414993 001 7 UPPER LEVEL ASSEMBLY ...
Страница 184: ...UPPER LEVEL ASSEMBLY 7 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Страница 213: ......
Страница 214: ......