Item Description
Activity
Limits / recording
Action on problems
Date
Signature
7
Gas filling
Check that the Transport pressure gauge has been removed and properly stored for
future use)
See instruction manual
Remove the Transport pressure gauge before
filling the bushing.
Check the filling gas parameters of the bottles from gas certificates and by quality tests
performed on the single bottle
Fill the Gas Check list
Do not fill with gas if gas is not OK.
Connect the gas hose to the bushing DILO type valve.
See instruction manual
---
Start filling operation.
Stop at 0.2 MPa abs (1 bar gauge)
---
Check for leakage with the gas leak-meter device.
Check all bushing flanges and connections
and also all the gas filling station (if included)
Contact GE Energy Connections RPV.
Increase the gas pressure until the Tripping contacts operates (0.52 MPa abs).
Check the remote reading of the gas pressure sensor
Gas pressure (B3/B4)=______/_____MPa abs
Remote pressure: ________________MPa bs
NO OK:
1) Check the wiring.
2) Reduce the gas pressure and repeat the
full test sequence.
3) Inform GE Energy Connections RPV
Increase the gas pressure until Alarm 2 contact operates (0.55 MPa abs).
Check the remote reading of the gas pressure sensor
Gas pressure (B3/B4)=______/_____MPa abs
Remote pressure: ________________MPa bs
Increase the gas pressure until Alarm 1 contact operates (0.58 MPa abs).
Check the remote reading of the gas pressure sensor
Gas pressure (B3/B4)=______/_____MPa abs
Remote pressure: ________________MPa bs
Increase the gas pressure at the rated filling value (0.63 MPa).
Wait 4 hours stabilize and record the pressure values.
Pressure recording
At gas monitor B3: ____________ MPa abs
At gas monitor B4: ____________ MPa abs
Remote pressure: ________________MPa bs
---
Perform a gas analyses and a gas Dew Point 48 h after the gas filling operation
Gas data recording
(see
Table 15
)
Filling pressure: ____________ MPa abs
Gas Purity: ____________ %SF6
SO2: ____________ ppm w
Dew point @ Filling pressure:______ °C
Contact GE Energy Connections RPV
8
Check PF tap and voltage divider
Check that the PF tap is firmly closed or that the adapter is installed and wired to the
divider unit.
See instruction manual
Do not energize the bushing if the PF tap
cap is missing or if the tap is not connected
to the voltage divider unit
---
9
Remove composite insulator plastic foils
Remove all plastic protective foils from both composite insulators when the bushing is
installed and the transformer is inside the valve room.
---
---
10
Top shield installation
Install the top shield bushing when the transformer is inside the valve room.
---
Содержание PHI 530.1425.2500
Страница 61: ...HVDC TRANSFORMER BUSHINGS PHI 530 1425 2500 PHI 265 850 1500 Kepco project IS 2664 GB Page 61 of 70...
Страница 62: ...HVDC TRANSFORMER BUSHINGS PHI 530 1425 2500 PHI 265 850 1500 Kepco project IS 2664 GB Page 62 of 70...
Страница 63: ...HVDC TRANSFORMER BUSHINGS PHI 530 1425 2500 PHI 265 850 1500 Kepco project IS 2664 GB Page 63 of 70...
Страница 64: ...HVDC TRANSFORMER BUSHINGS PHI 530 1425 2500 PHI 265 850 1500 Kepco project IS 2664 GB Page 64 of 70...