GE PACSystems RX3i IC695ACC403 Скачать руководство пользователя страница 1

GE 

For Public Disclosure 

Automation & Controls 
Programmable Control Products 

 

PACSystems* RX3i 
Rackless Energy Pack 
IC695ACC403 
Quick Start Guide 

 

GFK-3000A 

 

July 2018 

 

Содержание PACSystems RX3i IC695ACC403

Страница 1: ...GE For Public Disclosure Automation Controls Programmable Control Products PACSystems RX3i Rackless Energy Pack IC695ACC403 Quick Start Guide GFK 3000A July 2018...

Страница 2: ...e Connections 4 3 1 Connect Input Power to Energy Pack 5 3 2 Connecting the Energy Pack to the Controller 6 4 Grounding 7 5 Initial Power up 8 6 LED and Status Indications 9 6 1 LED Indications Specia...

Страница 3: ...r during power fluctuations or outages If system power is lost the Energy Pack maintains power long enough for a Controller to write its user memory contents to non volatile memory When system power i...

Страница 4: ...roller and connected to the Controller using the provided cable IC695CBL003 Heat dissipation When mounting the Energy Pack allow a minimum clearance of 25 4mm 1 inch on all four sides of the unit righ...

Страница 5: ...Mount to DIN Rail 2 2 Panel Mounting the Energy Pack Recommended fasteners Four M4 0 7 machine screws with minimum length of 25mm or 8 32 1 min length and nuts CAUTION Over tightening the mounting scr...

Страница 6: ...GFK 3000A IC695ACC403 Quick Start Guide 4 3 Cable Connections Figure 3 Input Power and Output Power Control Connections...

Страница 7: ...per wires An 18 AWG 0 82mm2 copper wire for frame ground An input power terminal block provided Weidmuller part number 1748010000 A small flat head screwdriver such as a 1 4mm jeweler s screwdriver 1...

Страница 8: ...and securely tighten the attaching screws 3 2 Connecting the Energy Pack to the Controller With power to the system turned off use the supplied cable IC695CBL003 to connect the output of the Energy P...

Страница 9: ...7 July 2018 GFK 3000A 4 Grounding Proper grounding of this device is essential All ground wires must be as short as possible and terminated at the same grounding point Figure 5 Frame Ground Connection...

Страница 10: ...this test passes output power to the Controller is turned on and the OUT LED turns on green 3 Charging of the CapPack begins and the STAT LED blinks green 4 When charging of the CapPack is complete th...

Страница 11: ...solid CapPack is fully charged and no faults Amber blinking CapPack is nearing end of life The CapPack must be replaced soon Backup is still guaranteed Red blinking Internal fault Cycle power to the...

Страница 12: ...matically monitor the status of the attached Energy Pack via S0014 PLC_BAT and SA0011 LOW_BAT For more details refer to the chapter on Diagnostics in PACSystems RX7i and RX3i CPU Programmer s Referenc...

Страница 13: ...t hot remove insert the CapPack during the firmware update process 1 Loosen the four screws on the CapPack and carefully pull the CapPack off the base 2 Install the new CapPack on the base first engag...

Страница 14: ...ble For details on status bit operation refer to the PACSystems RX7i and RX3i CPU Reference Manual GFK 2222 rev Y or later 8 Firmware Updates The firmware for the Energy Pack is automatically updated...

Страница 15: ...PACSystems Controllers Battery and Energy Pack Manual GFK 2741E or later PACSystems RX3i Series 90 30 Installation and Maintenance Requirements GFK 2975 For user manuals product updates and other info...

Страница 16: ...obal regional phone numbers are available on our web site www geautomation com 2016 2018 General Electric Company All Rights Reserved Trademark of General Electric Company and or its subsidiaries All...

Страница 17: ......

Отзывы: