GE C
OMPANY
D
IRECTION
5472001-1EN, R
EVISION
6
O
PTIMA
CT680 S
ERIES
AND
O
PTIMA
CT670 I
NSTALLATION
M
ANUAL
Page 32
Section 3.0 - Delivery Procedure
3.5
Working with the Mover
•
System is shipped lean-packed in North America.
•
Ensure that the installation lean cart is the first item moved into the room.
3.5.1
Delivery Dolly Options:
•
Gantry Mini Dolly - ordered from UMI at http://www.umi-dollyshop.com
Follow the instructions provided by your Project Manager of Installation regarding working with
equipment movers. Help direct movers as to where to place equipment and which items are needed
first.
Movers should move all equipment into the customer’s room. Door removal and other site changes
to move equipment should be done only as directed by the Project Manager of Installation.
For component sizes and weights, refer to the
Pre-installation Manual
for this system.
Note:
Do not place equipment in its final location at this time. Templates must be laid first.
Note:
If you have to remove the gantry covers in order to move the gantry into the room, please read the
notice statement on
Appendix A Gantry Cover Removal and Dolly Setup, on page 169
removing the gantry covers.
3.5.2
Equipment Delivery Route
Prior to equipment delivery, review the delivery route with the movers. Refer to the Project Manager
of Installation for any additional delivery instructions.
3.5.3
Floor Protection
Movers should use floor protection. Most equipment movers can provide floor protection during the
equipment delivery. Installers should provide floor protection for the room.
3.5.4
Removing Gantry Dollies and Covers
•
Gantry components cannot be removed to reduce the dimensions.
•
Zero clearance dollies are available from UMI at http://www.umi-dollyshop.com
•
Please read the notice statement on
before removing the gantry covers.
3.6
Damage In Transportation
Check for damage to property that may have occurred at the site during delivery, such as damage
to floors, door frames or walls. If damage is found, notify the Project Manager of Installation.
All packages should be closely examined at time of delivery. If damage is apparent, have notation
"Damage in Shipment" written on all copies of the freight or express bill before delivery is accepted
or "signed for" by a General Electric representative or a hospital receiving agent. Whether noted or
concealed, damage shall be reported to the carrier immediately upon discovery, or in any event,
within 14 days after receipt, and the contents and containers held for inspection by the carrier. A
transportation company will not pay a claim for damage if an inspection is not requested within this
14-day period.
To file a report:
•
Call 1-800-548-3366 and use option 8.
•
Fill out a report on http://egems.med.ge.com/edq/home.jsp
•
Contact the local service coordinator for more information on this process.
Rev. June 13, 2006
Содержание Optima CT680 Series
Страница 205: ...CT ...
Страница 206: ...206 www gehealthcare com ...