OEC 9800 Installation Procedure
3
Overview
Access the latest version of the
9800 Installation Report/Checklist,
00-879060, and use it in conjunction with this document.
Follow the installation procedures in the order written, and note that the sections of the procedures correspond to the same section
title in the
Report/Checklist
.
Unpacking the System
Note
:
The Workstation and C-Arm ramps are usually located on top of the Workstation’s enclosure. However, if the system is
shipped by air freight, the C-Arm ramp is typically stored inside the C-Arm enclosure.
1.
Before unpacking, inspect the shipping enclosure/boxes for damage and report to the shipper if available. Note any damage in
the Installation Comments section of the
Report/Checklist,
00-879060.
2.
Remove the banding from the Workstation and C-Arm shipping enclosure/pallets. See Figure 1 (next page).
3.
Remove the ramps from the top of the Workstation enclosure. See Figure 1 (next page).
4.
Remove the cardboard cap and lift the cardboard from the top of both enclosures. Discard both cardboard items.
5.
Remove the clear plastic covers from the Workstation and the C-Arm.
6.
Use the depalletization instructions located on the Workstation cable hanger (00-881509-XX) and C-Arm’s cross-arm (00-
881508-XX) to depallet the Workstation and the C-Arm.
7.
Record the results in the latest version of the
9800 Installation Report/Checklist
, 00-879060.