2–14
DGT DISTRIBUTED GENERATION TRIP CONTROL SYSTEM – INSTRUCTION MANUAL
ELECTRICAL INSTALLATION
CHAPTER 2: INSTALLATION
Electrical installation
This section describes the connection of external cabling to the DGT-D Assembly. The
figures below show overall views of the connection points for all external cabling and
wiring. Subsequent illustrations show more detailed views of power connections as
required.
Route the power and I/O signal wiring through the weathertight bushing on the bottom of
the enclosure. Do not tighten it until all cabling has been installed. All user connections for
power and signal wiring are made to the terminal block.
Terminal identification
Figure 2-2: DGT-U terminal layout
Figure 2-3: DGT-R terminal layout
Figure 2-4: DGT-D terminal layout