GE Monogram ZV950 Скачать руководство пользователя страница 8

Centerline

8" Min. Above

Top Mounting

Bracket Holes

6-1/4"

Centerline To Wall

FOR WALL VENT DUCT

FOR CEILING

VENT DUCTING

CL

124Dia14

8-1/2" Dia. Hole

CL

CL

CL

124Dia11

Installation Preparation

8

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.
• Locate the template packed with the literature.
  – Measure 36" from the floor to the top of the cooking 

surface. Add 25-1/2" (or other recommended space) 
from the cooking surface to the bottom of the hood. 
Mark that location.

  – Use a level to draw a straight pencil line on the wall.
 

CHECK INSTALLATION HARDWARE

Locate the hardware accessory box packed with the 
hood and check contents.

124Dia10

124Dia8

124Dia9

124Dia5

124Dia7

124Dia13

2 Large

Flat Washers

3 Phillips Head

Decorative Screws

3 Stainless Steel Grease Filters

8 Wood 

Screws

Wall Mount Template

2 Mounting Brackets

Duct Cover Bracket

4 Wall 

Fasteners

2-piece

Decorative Duct Cover

(dimension shown

for reference only)

  – Tape the template in position along the penciled 

line. CHECK TO BE SURE THE TEMPLATE IS 
LEVEL.

Ceiling ducting:

If ductwork will vent straight up to the ceiling:
• Use a level to draw a line straight up, from the  

centerline on the template to the ceiling.

• Measure 6-1/4" from the back wall to the centerline 

of a 8-1/2" hole on the ceiling.

Note:

 If drywall is not present, add drywall thickness

to the 6-1/4" dimension.

Wall Ducting:

If ductwork will vent to the rear:
• Use the level to draw a line straight up from the  

centerline on the template. 

• Measure at least 8" above the top mounting bracket 

holes shown on the template to the centerline of an 
8-1/2" dia. duct hole. (Hole may be elongated for 
duct elbow.)

HOUSE WIRING LOCATION:

• The junction box is located on the top of the hood, 

at the back right side.

• Route house wiring as close to the ceiling location  

as possible, through the ceiling, soffit or back wall. 
Wiring should enter at least 4" above the bracket  
on the right side.

124Dia6

124Dia12

16"

23"

11"

24"

124Dia13

Содержание Monogram ZV950

Страница 1: ...If you have questions call 800 GE CARES or visit our website at www monogram com Installation Instructions ZV950 36 Stainless Steel Vent Hood 124 Cover Art ...

Страница 2: ...n CAUTION To reduce risk of fire and to properly exhaust air be sure to duct air outside Do not vent exhaust air into spaces within walls or ceilings or into attics crawl spaces or garages PRUDENCE Il faut prendre soin d installer un conduit vers l extérieur pour réduire le risque d incendie et pouvoir évacuer l air correctement Il ne faut pas évacuer l air dans l espace entre les parois d un mur ...

Страница 3: ... 35 5 8 124Dia1 25 The supplied duct cover fits 8 ft to 10 ft ceilings The vent hood must be installed 24 min and 30 max above the cooking surface The hood installation height from the cooking surface to the bottom of the hood depends upon ceiling height Installation Height Depending on Ceiling Height 36 Min Cooking surface to bottom of hood should be 25 1 2 max for 8 ft ceiling height 25 1 2 to 3...

Страница 4: ... 2 to 27 1 2 25 1 2 to 28 1 2 25 1 2 to 29 1 2 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 25 1 2 to 30 26 1 2 to 30 26 1 2 to 30 26 1 2 to 30 26 1 2 to 30 26 1 2 to 30 30 min 30 min 30 min 30 min 30 min 30 min 30 min Duct Cover ZX14SDSS SUPPLIED OPTIONAL ACCESSORIES ZX14SDSS optional stainless steel duct cover is available for ceiling heights greater...

Страница 5: ...rcuit breaker or time delay fuse Wiring must be 2 wire with ground If the electrical supply does not meet the above requirements call a licensed electrician before proceeding Use metal ductwork These hoods must use 8 round duct It can transition to 3 1 4 x 12 reducing the maximum equivalent duct length to 75 feet Install a wall cap with damper or roof cap at the exterior opening Order the wall or ...

Страница 6: ...lexible ducting If flexible metal ducting is used all the equivalent feet values in the table should be doubled The flexible metal duct should be straight and smooth and extended as much as possible Do NOT use flexible plastic ducting Total Duct Run Note Any home ventilation system such as a ventilation hood may interrupt the proper flow of combustion air and exhaust required by fireplaces gas fur...

Страница 7: ...VE THE PACKAGING The vent hood is shipped secured to a shipping board with a shipping bracket and 4 screws Remove the duct cover parts box and other packaging Lift the hood out of the box Remove and properly discard the plastic wrapping Locate and remove 2 screws at the top of the hood Remove 2 screws at the bottom behind the filter guides on the left and right sides Remove the shipping bracket fr...

Страница 8: ... 2 piece Decorative Duct Cover dimension shown for reference only Tape the template in position along the penciled line CHECK TO BE SURE THE TEMPLATE IS LEVEL Ceiling ducting If ductwork will vent straight up to the ceiling Use a level to draw a line straight up from the centerline on the template to the ceiling Measure 6 1 4 from the back wall to the centerline of a 8 1 2 hole on the ceiling Note...

Страница 9: ...for Ductwork 124Dia25 View From Rear Cleats 1 x 6 Min Mounting Support 2 INSTALL MOUNTING BRACKETS This vent hood must be secured to the horizontal support or wall studs With the template taped in place use a punch to mark all mounting screw locations Drill 1 8 pilot holes at the 6 punched locations Remove the template The 4 support bracket holes must enter studs or the horizontal support Note Scr...

Страница 10: ...mounting brackets Tighten lower mounting screws Tighten screws B located at the top of the mounting bracket against the hood to clamp the position Do not overtighten screws 3 INSTALL DUCT BRACKET The duct bracket must be installed against the ceiling This bracket will hold the decorative duct cover in place at the top Install the 2 small screws into the sides of the duct bracket Remove the screws ...

Страница 11: ...nd wire a ground must be provided by the installer When house wiring is aluminum be sure to use U L approved anti oxidant compound and aluminum to copper connectors AVERTISSEMENT Si la maison n est pas câblée avec deux fils et un fil de terre l installateur doit installer un fil de terre Quand les fils sont en aluminium il faut prendre soin d utiliser des connecteurs aluminium à cuivre avec une pâ...

Страница 12: ... film covering the control panel on the front face of the hood and any other packaging materials Refer to the Owner s Manual for operating instructions Note While performing installations described in this book safety glasses or goggles should be worn For MonogramTM local service in your area call 1 800 444 1845 Note Product improvement is a continuing endeavor at General Electric Therefore materi...

Отзывы: