GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
8-170
Section 8-42 - Replacement of ECG
Section 8-42
Replacement of ECG
8-42-1
Manpower
1 Person, 5 minutes.
8-42-2
Tools
Standard Phillips screwdriver.
8-42-3
Removal Procedure
1) Remove OPIO covers (refer to
)
2) Remove cables on ECG Assy (square) and unscrew 4 screws (circle). Refer to following figure.
Figure 8-200 Cables position and points.
3) Remove ECG Assy.
4) Unscrew 4 screws and remove ECG BRKT.
Figure 8-201 ECG BRKT screw points.
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...