GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-137
Section 8-25
Replacement of Battery
8-25-1
Manpower
1 person, 1 hour
NOTE:
LP9/P7 BUM 5504583 provides the information, "Refreshing the battery" in Chapter 3 Preparing to
System for Use. The recommended procedure can be executed by user for maintaing battery life.
8-25-2
Tools
Standard Phillips Screwdriver.
8-25-3
Removal Procedure
1) Unscrew 12 screws to remove the IO BOX Cover.
Figure 8-160 Screw points of IO BOX cover
Содержание LOGIQ P9
Страница 2: ......
Страница 11: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL ix ZH CN KO ...
Страница 40: ...GE LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 SERVICE MANUAL xxxviii Table of Contents ...
Страница 184: ...GEDRAFT LOGIQ P9 P7 DIRECTION 5604324 REVISION 11 DRAFT JANUARY 24 2019 SERVICE MANUAL Chapter 4 Functional Checks 4 44 ...
Страница 601: ...This page was intentionally left blank ...