GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
8 - 140
Section 8-4 - Software Installation
Section 8-5Full Backup / Restore Procedure
8-5-1
General
This describes a Full Backup (Database, Image, User preset, Service Data) procedure.
Use this instruction when you need to save the data :
•
before changing a HDD with a new one
•
before reinstalling Base Application
•
when you just want to save all of the current data.
8-5-2
Parts Required
•
USB HDD
8-5-3
Full Backup Procedure
1.) While the Echoloader is running, press ‘Utility’ button and click on the ‘Admin’.
2.) When Title Login window pops up, select an operator with admin authorization.
3.) Type in the password.
4.) press “OK”.
5.) Select “System Admin” page.
6.) press “Execute” button under Full Backup box and the window below pops up.
Figure 8-210 Backup and Restore Window
Содержание LOGIQ P6
Страница 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Страница 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Страница 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Страница 130: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL 4 50 Section 4 9 Board Function Checks ...
Страница 477: ......