GE PROPRIETARY
TO
GE
D
IRECTION
5308917-100, R
EVISION
8
LOGIQ P3 S
ERVICE
M
ANUAL
8-58
Section 8-5 - USB Cable Set (FRU P/N: 5315039)
8-5-2
Power distribution Board Assembly (P/N: 5370455), PDB Sub (P/N: 5370323),
PDB Sub (Part no.: 5397797) - LOGIQ P3BT10
8-5-2-1
Tools
•
Common Phillips screwdrivers
8-5-2-2
Needed Manpower
•
1person, 15 minutes
8-5-2-3
Preparations
Shutdown the system and switch off the main Circuit Breaker at the bottom rear side of the system
8-5-2-4
Removal Procedure
1) Loosen the two screws (A) and pull out the Cables which are connected to PDB as shown in rectangle
box (B) in the figure.
2) Remove PDB assembly.
Figure 8-65 Removing Hard Disk Drive Power cable
(B) Power cables
(A) Two Screws
(B) Power cable
Содержание LOGIQ P3 PRO
Страница 2: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 1 2...
Страница 9: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL vii...
Страница 98: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 3 32 Section 3 10 Paperwork...
Страница 194: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 7 26 Section 7 6 Troubleshooting...
Страница 294: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 8 100 Section 8 14 Loading Software...