System Start-Up
LOGIQ E9
–
User Guide
1-27
Direction 5454884-100 English
Rev. 1
Circuit breaker
The Circuit Breaker is located at the rear panel of the system.
On supplies main power to all internal systems. Off removes
main power from all internal systems. The circuit breaker
automatically shuts off power to the system in case of a power
overload.
If a power overload occurs:
1. Turn off all peripheral devices.
2. Reactivate the Circuit Breaker switch.
The Circuit Breaker switch should stay in the
On
position;
DO
NOT
hold the switch in the
On
position. If the Circuit Breaker
switch remains
On
, follow the Power On procedure.
NOTE:
If the Circuit Breaker switch does
not
remain in the
On
position
or trips again:
1. Disconnect the Power Cable.
2. Call
Service
immediately.
DO NOT
attempt to use the system.
Figure 1-14.
Circuit Breaker (located at the rear of the system)
Содержание LOGIQ E9
Страница 4: ...i 2 LOGIQ E9 User Guide Direction 5454884 100 English Rev 1 This page intentionally left blank ...
Страница 8: ...i 6 LOGIQ E9 User Guide Direction 5454884 100 English Rev 1 ...
Страница 12: ...i 10 LOGIQ E9 User Guide Direction 5454884 100 English Rev 1 ...
Страница 126: ...Performing an Exam 2 40 LOGIQ E9 User Guide Direction 5454884 100 English Rev 1 ...
Страница 202: ...After the Exam is Over 3 76 LOGIQ E9 User Guide Direction 5454884 100 English Rev 1 ...
Страница 250: ...Safety 4 48 LOGIQ E9 User Guide Direction 5454884 100 English Rev 1 ...
Страница 254: ...Index 4 LOGIQ E9 User Guide Direction 5454884 100 English Rev 1 ...
Страница 255: ......
Страница 256: ......