GE M
EDICAL
S
YSTEMS
D
IRECTION
2380207
, R
EVISION
7
LOGIQ™ 5 PRO S
ERVICE
M
ANUAL
Chapter 8 Replacement Procedures
8 - 103
8-8-1-5
BEP Cable Connection with Console( In case of change BEP 1 into BEP2 or BEP3)
1.) Push the BEP Assy into The System and then Connect PCI Cable.
2.) Check the PCI cable is arranged without short before connecting PCI cable to BEP.
3.) Connect the PCI cable to the BEP assy.
4.) Connect the J2 Cable connector(44pin D Sub connector)to the BEP.
Figure 8-93 PCI cable connection
Figure 8-94 J2 cable connection
P C I
C a b le
J 2 C a b le
Содержание LOGIQ 5 PRO
Страница 2: ...GE MEDICAL SYSTEMS DIRECTION 2407381 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL Page 1 2 ...
Страница 3: ......
Страница 7: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL ii iii ...
Страница 50: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL 2 12 Section 2 3 Facility Needs ...
Страница 462: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL A 4 Index INDEX ...