KTD-125/127 PTZ Receivers User Manual
Programming
1040823A / June 2003
29
6 C
OMPLETING AND
T
ESTING THE
I
NSTALLATION
(A
LL
U
NITS
)
To finalize the cable installation, perform the following.
1)
Reinstall the main relay board into the housing.
2)
Reinstall the removable terminal strips onto the main relay board
and receiver card.
3)
Reconnect the power cable connector to the power input on the
main relay board.
4)
If you have a unit with a weatherproof housing, tighten the
watertight cable openings.
To test for proper installation, perform the following.
1)
Check all connections.
2)
Supply power to the unit.
3)
If you have a KTD-125 unit, confirm that the power switch on the
main relay board is on.
4)
Test for proper operation using the on-site toggle switches on the
main relay board. (See Appendix B, Using On-Site Toggle
Switches)
Содержание Interlogix KTD-125
Страница 1: ...KTD 125 125 24 KTD 125P 125P 24 KTD 127 127W PTZ Receivers ...
Страница 37: ......