background image

Ardex P-82 Primer for preparation of non-porous floors such as tile, sealed concrete

and terrazzo

Ardex K–15 Self leveling grout (10 kg pails)

Ardex tools and materials can be obtained from local Ardex distributors if not included in

installation kit. Contact Ardex at the location below for a list of local distributors:

Ardex, Inc.

630 Stoops Ferry Road

Corapolis (Pittsburgh), PA 15108

Phone: (412) 264-4240 Telex: 866264 us cora

2.4.1.2  Requirements
The quantity of self–leveling grout needed for an installation depends upon two variables: The area

to be covered and the variation in the level of the floor.

1. Use the following to assist you in determining the amount of grout to mix for your installation. :

One pail contains 10 kg of grout and covers 60 sq. ft. (5.4 sq. meters) at a grout thickness of

2.5 mm.

2. Also refer to manufacturers instructions.

2.4.1.3  Floor Preparation And Priming
Ardex P–51 and P–82 Primers are used to prepare the flooring surfaces upon which grout will be

applied to improve bonding and to reduce moisture lost from the grout during drying.

NOTE:

If the floor is tiled, the tile must be removed under the area to be primed and grouted.

Remove as much mastic as possible but do not use a solvent. Solvents prevent good

bonding.

NOTE:

If the floor is carpeted it must be cut and removed from the area to be primed and grouted.

A minimum additional 2 inches (51 mm) must be temporarily lifted out of the way all

around if a dam is to be constructed.

NOTE:

Prepare the floor such that the Innova

IQ

 Table base plate will be flush with the floor

surface.

1. Floor surface must be clean and free from grease, wax, latex compounds, curing compounds,

dust and other foreign matter where grouting will be applied. Use a vacuum cleaner to clean

dust from floor area.

2. Mark outline on floor to dimensions of area to be grouted.

3. Prepare Ardex P–51 or P–82 Primer by diluting with an equal part of water.

a. Use Ardex P–51 on concrete floors and wood subfloors.

Single Plane and Biplane Innova Systems Pre–Installation Kit Installation Procedures

GE Healthcare

Direction 2290880-12-1EN, Revision 1

22

2  PIST0003 - Vascular Gantry Base Plate and Innova IQ Table Base Plate

Содержание Innova Series

Страница 1: ...GE Healthcare Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures OPERATING DOCUMENTATION 2290880 12 1EN Revision 1...

Страница 2: ...Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 2...

Страница 3: ...od Ne poku avajte servisirati opremu ako niste u potpunosti pro itali i razumjeli ovaj ser visni priru nik Zanemarite li ovo upozorenje mo e do i do ozljede davatelja usluge operatera ili pacijenta us...

Страница 4: ...en alvorens deze onderhoudshandleiding werd geraadpleegd en begrepen is Indien deze waarschuwing niet wordt opgevolgd zou het onderhoudspersoneel de operator of een pati nt gewond kunnen raken als gev...

Страница 5: ...es dangers lectriques m caniques ou autres WARNUNG DE Diese Serviceanleitung existiert nur in englischer Sprache Falls ein fremder Kundendienst eine andere Sprache ben tigt ist es Aufgabe des Kunden f...

Страница 6: ...olo dopo aver consultato il pre sente manuale ed averne compreso il contenuto Il mancato rispetto della presente avvertenza potrebbe causare lesioni all addetto alla manutenzione all operatore o ai pa...

Страница 7: ...wym i zrozumienia go Niezastosowanie si do tego ostrze enia mo e doprowadzi do obra e serwisanta operatora lub pacjenta w wyniku pora enia pr dem elektrycznym zagro enia me chanicznego b d innego ATEN...

Страница 8: ...Tento n vod na obsluhu je k dispoz cii len v angli tine Ak z kazn kov poskytovate slu ieb vy aduje in jazyk ako angli tinu poskytnutie prekladate sk ch slu ieb je zodpovednos ou z kazn ka Nepok ajte...

Страница 9: ...m jeziku mora stranka za gotoviti prevod Ne posku ajte servisirati opreme e tega priro nika niste v celoti prebrali in razumeli e tega opozorila ne upo tevate se lahko zaradi elektri nega udara mehans...

Страница 10: ...Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 This page left intentionally blank 10 Important Information...

Страница 11: ...of 2290880 7 1EN The previous release of this document was 2290880 6 100 Updated with modifications to Baseplate kit flow diagram 58 2290880 8 1EN July 2008 Table for table LC positioner updated 58 22...

Страница 12: ...Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 This page left intentionally blank 12 Revision History...

Страница 13: ...se plate 26 2 4 4 Base plate placement Floor plate 27 3 PIST0004 Above Grade Base Plate Insert Installation 28 4 PIST0005 Floor Anchor Mounting On Grade 31 5 PIST0006 Vascular Above Without Insert 34...

Страница 14: ...285054 Templates 45 1 4 1 2285056 A C N Templates 45 1 4 2 2186109 EP Template 45 Chapter 3 SYSTEM FLOOR MOUNTING TEMPLATE 49 1 Templates 49 Single Plane and Biplane Innova Systems Pre Installation Ki...

Страница 15: ...a or InnovaIQ Table with the correct alignment to the gantry Isocenter aligned and proper clinical usage distance between gantry and table NOTE The preferred method of gantry table floor mounting is t...

Страница 16: ...OF SPECIALLY DESIGNED BENEATH THE FLOOR STEEL CHANNELS TO ENSURE THE THROUGH BOLT MOUNTING HARDWARE DOES NOT FAIL DURING USE THESE CHANNELS MUST BE DESIGNED BY AN AUTHORIZED LOCAL STRUCTURAL ENGINEER...

Страница 17: ...acement and floor hole drilling plan The approval should include an inspection of the floor concrete strength identification of any sub floor obstructions and drill hole size and depth requirements NO...

Страница 18: ...ble is to be installed This is the isocenter line It passes through the gantry isocenter and the table pivot point Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures...

Страница 19: ...o them The template can be slightly adjusted about the cable exit hole isocenter to accommodate the rebar positioning Be sure to shift the isocenter line if necessary to accommodate positioning the Om...

Страница 20: ...ench for 3 4 20 mm nuts 1 1 1 4 30 mm socket for 3 4 20 mm bolts 1 15 16 torque wrench socket 1 Vacuum cleaner 1 2 3 2 Consumables Item Qty Effectivity Part Manufacturer Base Plate Assembly 1 2285048...

Страница 21: ...pecialist or lead field engineer to verify that the proper full size floor mounting template is used 1 Assure the following tools for grouting 1 2 heavy duty double insulated electric drill 650 rpm or...

Страница 22: ...ied to improve bonding and to reduce moisture lost from the grout during drying NOTE If the floor is tiled the tile must be removed under the area to be primed and grouted Remove as much mastic as pos...

Страница 23: ...loor 4 Dampen the area to be grouted with water 2 4 1 5 Grout Preparation Procedure Ardex K 15 when mixed with water becomes a liquid compound which seeks its own level and automatically produces a sm...

Страница 24: ...Base plate Placement Floor Anchor Installation 2 4 2 1 Gantry Base plate 1 After grout has hardened remove the foam 2 Smooth off the air bubble shells and clean off the bottom of the base plate and b...

Страница 25: ...m of the base plate 3 Position base plate over the anchor holes hardstop towards the table Tap each anchor through the base plate and into its hole with a hammer Refer to PIST0002 Prepare Floor LC Bas...

Страница 26: ...3 9 6 12 12 holes Refer to Illustration 1 2 5 After you have torqued the bolts go back every half hour and check the torque two times should be adequate A creeping function of the bolt may have caused...

Страница 27: ...ert and torque each of the base plate bolts to 20 ft lbs 2 7 daN m to seat the plate and keep it from moving Continue to torque each bolt in 20 ft lbs 2 7 daN m increments until 150 ft lbs 20 daN m fo...

Страница 28: ...he insert and the contractor supplied conduit 3 3 Preliminary Requirements 3 3 1 Consumables Item Qty Effectivity Part Manufacturer Base Plate Assembly 1 2285048 grout anchor bolts water electric Sepa...

Страница 29: ...Illustration 1 3 Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 Chapter 1 Installation Procedure 29...

Страница 30: ...alization No finalization steps Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 30 3 PIST0004 Above Grade Base Pl...

Страница 31: ...rbide tipped drill bit for installing gantry and table through bolts 25 mm 1 recommended 1 10 mm 3 8 drill bit for pilot holes 1 Impact drill for use with carbide tipped drill bits We recommend Skill...

Страница 32: ...AL STRUCTURAL ENGINEER OR ARCHITECT INSPECT THE COMPRESSION STRENGTH OF THE CONCRETE FLOOR BEFORE USING FLOOR ANCHORS THE MAXIMUM PULLOUT FORCE PER ANCHOR WA CALCULATED ASSUMING A REGULAR WEIGHT CONCR...

Страница 33: ...1 5 4 4 Finalization No finalization steps Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 Chapter 1 Installation...

Страница 34: ...rill bit for installing gantry and table through bolts 25 mm 1 recommended 1 10 mm 3 8 drill bit for pilot holes 1 Impact drill for use with carbide tipped drill bits We recommend Skill 906 roto hamme...

Страница 35: ...SPITAL STRUCTURAL ENGINEER OR ARCHITECT INSPECT THE COMPRESSION STRENGTH OF THE CONCRETE FLOOR BEFORE USING FLOOR ANCHORS THE MAXIMUM PULLOUT FORCE PER ANCHOR WA CALCULATED ASSUMING A REGULAR WEIGHT C...

Страница 36: ...5 4 Finalization No finalization steps Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 36 5 PIST0006 Vascular Abo...

Страница 37: ...pplied 1 LC Positioner and Table Floor Preparation Kits Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 Chapter 2...

Страница 38: ...2 1 Biplane kit selection Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 38 1 LC Positioner and Table Floor Prep...

Страница 39: ...cular system floor preparation are contained in catalog There are some additional gantry table mounting kits based on each mounting method through bolts or floor anchors Single Plane and Biplane Innov...

Страница 40: ...85059 12 Hole Floor Baseplate 1 pc Lift Plate 2290939 Lifting Straps 2 pc Hex Head Screw 5166535 Hex Head Screw 1 2 13UNC L1 1 2 12 9 Black 2 pc Grease 2295599 Lithium grease lubricant 100g 2 pc Doc 2...

Страница 41: ...olt 6 pc Plate 2290941 Special Steel Spacer Plate 4 in x 4 in 102 mm x 102 mm one for each bolt 6 pc Nut Hex 99141607 Hex Nut M20 STL galvanized two for each bolt 12 pc Dowel 2290937 Wood Dowel 24 mm...

Страница 42: ...Quan Notes Bolt Hex 2296892 Through Bolt M20 500 400 12 bolts for Gantry and 4 bolts for Table 16 pc Through Bolt mounting method hardware Washer Flat 99142204 Special Flat Washer for Through Bolts on...

Страница 43: ...oor anchor with insert Table 2 6 Item Name Part Description Quan Notes Floor Anchor 46 302265P1 Floor Anchor Bolt 5 8 10 x 6 in drilling 12 anchors for Gantry and 4 an chors for Table 16 pc Above Grad...

Страница 44: ...owel 24 mm diameter 12 pc Water Elec tric Separa tor 2268647 Manufactured part introduced in Positioner key hole to fit 1 electrical conduit of 6 1 pc Electrical and water con duits separated inch siz...

Страница 45: ...ry Omega IV Compact Or Omega V Long Table System Floor Mounting Template Gantry Omega V Long Table System Floor Mounting Template Optional in Chapter 3 Templates for details 1 4 2 2186109 EP Template...

Страница 46: ...2359194 Angio Configuration Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 46 1 LC Positioner and Table Floor P...

Страница 47: ...ration Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 Chapter 2 Innova LC Positioner and Omega Innova IQ Table F...

Страница 48: ...e and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 This page left intentionally blank 48 1 LC Positioner and Table Floor Prepar...

Страница 49: ...Floor Mounting Template 1 Templates Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 Chapter 3 System Floor Mount...

Страница 50: ...Illustration 3 1 Hole Location in concrete floor Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12 1EN Revision 1 50 1 Templates...

Страница 51: ...not necessary to drill the baseplate cover fixing holes H as they are not used Single Plane and Biplane Innova Systems Pre Installation Kit Installation Procedures GE Healthcare Direction 2290880 12...

Страница 52: ...Omega V non motorized Long 1278 mm 50 3 in NA 1595 mm 62 8 in InnovaIQ Table 1278 mm 50 3 in 1395 mm 54 9 in 1595 mm 62 8 in NOTE Distance not authorized for new installations Single Plane and Biplan...

Страница 53: ......

Страница 54: ...2011 General Electric Company GE Medical Systems a General Electric Company going to market as GE Healthcare 283 rue de la Mini re 78530 Buc FRANCE www gehealthcare com...

Отзывы: